Agenda/Minutes of the VIS Meeting on 2018/2/16
2018/2/23 13:30 -
Participants:
Progress report
Schedule Chart
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-A (Takahashi)
Past week report
[X-front]
- Attached the additional FR blade to the BF.
- Needed some try and errors due to some problems (low Q, FR range, height of blade).
- Tuned the BF again. Optimal load was 197.1kg at 0.31Hz. The FR range was 7.5mm.
- Closed the cap of BF.
- Extended the EQ stop to the F3 stage.
- Lifted down the DP into the corrugate tube.
- Set the F3 onto the end plate. maraging wire was hooked to the receptacles.
- Tuned the F3 to 0.31Hz initially.
- The optimal load was changed by closing the cap and hunging the F3.
- Finally the frequency was 0.27Hz reducing the weight by 0.4kg.
- Checked the range of FR in F3. It was 13.5mm.
- Calibrated the LVDT in F3.
- Started cabling between the BF and the F3.
Plan for coming weeks
[Next week]
- Finish the cabling between the BF and the F3.
- Lift down the BF into the corrugate tube.
- Go to the F2 stage.
[Week of March 5]
- Vent the EXV chamber on 5th.
- Remove the IXV DP on 6th.
- Insert the maraging wire for Cryo-payload with cables.
Type B (Mark)
Report for week of 2/19
- We did TFs from the IM OSEMs.
- We secured the cables inside the BF, added the cap and anchored the cables from below the BF to the cap.
- We lifted the BF/... section with the load gauge adapter and measured the weight, which was about as expected.
- Based on the measured weight, Fabian prepared an 800 g set of masses for the top of the BF.
- We added the AF crossbars and the section of the SS below the SF and craned in the SF.
- We installed the SF-BF rod and flying saucer and suspended the BF/... section. With the 800 g placed temporarily on the BF, the SF keystone floated at about mid-range.
Plan for week of 2/26
- Shoda-san at Mitaka.
- -
- Enzo at Mitaka Mon 2/26.
Remove LBB temporary ballast masses from BS chamber.
- Route cables up to under SF.
- Check/adjust total mass and balance of BF/... section, especially IM OSEMs.
- Cable and calibrate SF LVDT.
- Add Cu segments to SF cap.
- Install cap.
- Lift SF/... section and check total mass and balance.
Plan for week of 3/5
- Shoda-san at Mitaka.
- Hirata-san vacation Mon 3/5, then Kamioka
- Others at Kamioka.
- -
- Get SRM tank mushroom section installed (Hirata-san, Kimura-san)
- SR3 rack setup.
- Other tasks TBD.
Plan for week of 3/12
- Shoda-san at Mitaka.
- Mark at ASJ (Chiba) Fri 3/16.
- Hirata-san vacation Mon 3/5, then Kamioka
Plan for week of 3/19
- Mark at LVC meeting
- Shoda-san, Fabian at Mitaka
Plan for week of 3/26
- Mark vacation.
- Others ???
To-Do Lists, Schedule
Vacation Info
- Enzo Mitaka day 2/26
- Hirata-san vacation 3/5
- Hirata-san vacation Mon 3/5
- Fabian 3/26-4/27 vacation (then gone).
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
- OSEM test
- Removed a magnet from OSEM and measured response.
- It seemed that PD or LED inside OSEM has weak magnetic feature.
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Preparation for assembly of mass products.-->Ongoing.
Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)-->
There is no delivery.-->Contacting the vendor.
Plan for coming weeks
- Preparation for assembly of mass products.
- Adjustment and approval to vendors(Implementation adjustments and approvals for circuit boards.)
Other site works
- 2/26 - 3/9 Construction of the walls to isolate the arms better (for cleanliness)
- 3/12 - 3/16 Installation of the control systems for the large GVs
- 3/12 - Center area: preparation for pump down: connecting ducts.
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
- Center area pump down
- PR2/3 height adjustment
Travel Plans
- Travel (Week of 2/26):
- Takahashi: 26 -2
- Okutomi: 26 -2
- Sato: 26 -1
- Ishizaki: 26 -1
- Mark: 26 -2
- Fabian: 26 -2
Hirata:26 -2
Enzo:27 -2
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 26 -2
- Arai (ICRR):
- Travel (Week of 3/5):
- Takahashi: 5 - 9
- Okutomi: 5 - 9
- Sato: 5 - 9
- Ishizaki: 5 - 9
- Mark: 5 - 9
- Fabian: 5 - 9
- Hirata: 6 - 9
- Enzo: 5 - 9
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Kozu (ICRR): 5 - 9
- Arai (ICRR):
Next meeting
On 2018/3/2(Fri)
VIS Meeting in Mitaka: 3/16