Agenda/Minutes of the VIS Meeting on 2019/4/5
2019/4/5 13:30 - 13:55
Participants: Fabian, Takahashi, Aso, Mark, Hirata, Sato, Lucia, Tanaka, Ishizaki
Progress report
Schedule Chart
Site work schedule: [[|XLSX]]
Type-A : (PDF/MPP)
Type-B: (PDF/MPP)
Type-C: (XLSX)
Type-A (Takahashi)
Past week report
[Y-end]
- Found that the pin assignment in the connector for F0 LVDT-actuator was wrong. It was revised.
Plan for coming weeks
Type B (Mark)
Report for the week of 4/1
- Support of Type Bp
- Hirata-san procured the jigs for PRs and Takahashi-san tested one at TAMA.
- Hirata-san cleaned up the flags for PR2 and Mark did the one for PRM.
- Fabian helped Fujii-kun and Takashashi-san to reglue the flags.
- Mark did a lot of maintenance on the MEDM screens:
- Made the name of the suspension more obvious (no yellow text!).
- Added rack temperature indicators.
- Fixed the labels in the ADC screen (to reflect the LEN OL moving from ADC#0 to #1).
- Fixed broken links.
- Committed files to the SVN.
- Mark did maintenance on the Guardian to make it give more helpful messages in the TRIGGER state. Formerly it only checked the user model watchdog and the coil driver watchdog, not the DACKILL, and gave the same generic notification for both. Now it checks all three and tells the user which need attention.
- Mark tidied up the cables in the SR2 rack and returned a large pile of no-longer-used cables to the tent.
Mark started a HealthCheck page on the Operation Manual wiki.
- Fabian updated the SUMCON and Matlab models of SR2 to improve agreement with each other and with measured TFs. He noticed some resonances in the TFs around 60-70 Hz. We suspect modes of the side plates of the IRM, so he will try doing an FEA analysis.
Plan for week of 4/8
- Mark, Fabian at Kamioka Mon-Fri.
- Help with Type Bp.
- Health checks on Type B.
- Monitor pumpdown.
- Work on Type B paper.
- Modify RT models and/or Guardian to revert to the SAFE state under control in all but the most extreme emergency situations (rather than suddenly shutting off all output).
- Tidy up.
- Gather and clean tools.
- Gather and organize unused parts and fasteners.
Plan for week of 4/15
- Mark at Mitaka 4/15, Kamioka 4/16-18, f2f 4/19.
- Fabian at Kamioka 4/15-18, f2f 4/19.
Vacation/Travel Info
- Mark at Mitaka 4/15.
- f2f 4/19 (Friday), 4/20, 4/21.
- Terrence's next visit from 4/18.
- Fabian's vacation 4/26 to 5/10.
- Mark's vacation from about 5/22 to 6/11.
- Mark's final day 6/28.
Type-Bp (Shoda)
Past week report
Plan for coming weeks
OMMT & OSTM (Ohishi)
Past week report
Plan for coming weeks
VIS electronics (Tanaka)
Past week report
Plan for coming weeks
Other site works
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
Discussion
- F2F talk slots
- VIS summary talk: Takahashi (20min)
OpLev: Terrence ? (10min)
- Type-A control: Lucia (10min)
Travel Plans
- Travel (Week of 4/8):
- Takahashi:
- Sato:
- Mark: 8-12
- Hirata:
- Shoda:
- Fujii: 9-12
- Tanioka:
- Tanaka:
- Terrence:
- Travel (Week of 4/15):
- Takahashi:
- Sato:
- Mark:
- Hirata:
- Shoda:
- Fujii:
- Tanioka:
- Tanaka:
- Terrence:
Next meeting
On 2019/4/12(Fri)