Contents
Activities in this week
CRY/Cryo-payload EX, takafumi.ushiba: EX payload upgrade (15878)
takafumi.ushiba: Comment (15948)
CRY/Cryostat IY, takayuki.tomaru: IYC cooling restart (15951)
VIS/EY, ryutaro.takahashi: Setup of F3 (15932)
kouseki.miyo: Comment (15936)
VIS/EY, ryutaro.takahashi: Setup of F2 (15950)
VIS/EY,
Monday naohisa.satou: Connection between F3 and F2 (15959)
VIS/General, satoru.ikeda: Support for common model files: Installation on Type-A (ETMX, ETMY, ITMX) and Type-B (SRM, SR2) (15641)
kouseki.miyo: Comment (15938)
VIS/General, satoru.ikeda: We investigated the network connection. (15737)
Monday satoru.ikeda: Comment (15956)
VIS/General,
Monday satoru.ikeda: About Picomotor's 24-hour operation (15958)
VIS/PR3, fabian.arellano: Gluing the mirror wire. (15844)
fabian.arellano: Comment (15941)
VIS/PR3, fabian.arellano: Traverser motor test and cabling. (15889)
satoru.ikeda: Comment (15944)
VIS/PRM,
Monday satoru.ikeda: Checking the operation of PRM's Picomotor PRM_BF and PRM_IM (15957)
VIS/SR2, satoru.ikeda: Support for common Payload model files: Payload of Type-B (SR2) is supported to PAYLOAD_MASTER. (15684)
kouseki.miyo: Comment (15937)
VIS/SR3, fabian.arellano: Oplev installation and alignment recovery. (15928)
kouseki.miyo: Comment (15935)
VIS/SR3,
Monday fabian.arellano: Comment (15953)
Agenda/Minutes on 2021/2/12
CRY+VIS Interface Meeting
13:30-14:00
Participants:
VIS Meeting
14:00-14:40
Participants:
Progress report
General
Type-A
Type-B
Type-Bp
Type-C
Controls
Electronics
Towards O4
- Type-B/Bp remedy work is on going.
- Installation of Type-A is on going in EY.
- Schedule.
- Procedure documents.
- Criteria in the acceptance test.
Safety
Discussion
Travel Plans
The week from 2/8
- Takahashi: 2/8-12
- Sato: 2/8-12
- Hirata: 2/8-12
- Yano: 2/8-12
The week from 2/15
- Takahashi: 2/15-19
- Sato: 2/15-19
- Hirata: 2/15-19
- Yano: 2/15-19
Next meeting
- On 2020/2/12(Fri)