Activities in this week

VIS/General

VIS/EY

Summary: Setup of the F2 stage in EY: installation of suspension wire, cabling, calibration of LVDT, check of FR range, tuning

VIS/IX

Summary: Connection of the cryo-payload in IX, mounted the geophones onto the IP in IX, and compressed the F0 blades in IX.

VIS/MCE

VIS/PR3

Summary: Ikeda-san tested the picomotor operation and measured rough calibration value for PR3-IM picomotor (15977). During the test for BF picomotor, it was stucked (15976). So we need open the top chamber to fix that.

VIS/PRM

VIS/SR3

Agenda/Minutes on 2021/2/12

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-

Participants:

Progress report

General

[Miyo] See Activities/General

Type-A

Type-B

Type-Bp

[Miyo] See PR3 [Miyo] See PRM

Type-C

Controls

Electronics

Towards O4

Safety

Discussion

Travel Plans

The week from 2/15

The week from 2/22

Next meeting