Agenda/Minutes on 2021/2/19

Zoom Meeting

CRY+VIS Interface Meeting

13:30-

Participants:

Post O3 Upgrade portal

VIS Meeting

14:00-

Participants:

Progress report

Schedule

vis_gant+0219

JGW-L2011475-v26

General

General

Summary:

[Ikeda] Investigation of the cable length for network cable and temperature control in center are was done. Investigation for both end station was not. [1,2] [Miyo] Automation script to make the foton files was made. In this week I reproduce the OSEMINF foton file for all Type-Bp suspension by suing the script. This script will help us to avoid human error.

  1. 15737 We investigated the network connection. , satoru.ikeda

    • 16028 Comment, satoru.ikeda

  2. 16036 Cabling for temperature control equipment , satoru.ikeda

  3. 16038 Initialize the OSEMINF filters for all Type-Bp suspensions , kouseki.miyo

    • 16040 Comment, kouseki.miyo

Type-C

MCF Summary:

Type-A

EY Summary:

IX Summary:

Type-Bp

PR2

Summary: [Miyo] I connected the cables for PRM minirack because these had been disconnected from Fujimi-sangyo clean work.

PR3 Summary:

PRM Summary:

Type-B

SR3 Summary:

Electronics (Tanaka-san)

Control (Miyo)

Towards O4

Safety

Discussion

Travel Plans

The week from 2/22

The week from 3/1

Next meeting