Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/3/25 13:00-13:30
Participants: Takahashi, Node, Sato, Miyoki, Yokozawa, Akutsu, Ushiba
Schedule
- IX: Offload of IP and GAS.
- EX: Moving mass sign.
- IY: Health check. Height of ITMY was 3mm lower. One geophone should be checked.
- EY: Recovery of F2.
- Type-B/Bp/C: BF LVDT jump in PRM. Oplev in SR2.
Status
- Replacement of flip cables: TMS.
- TM height setting: ITMY.
- Oplev: Set only for the tilt in IY.
- ACC:
- Commissioning in air: Alignment of ITMY.
- Commissioning in vacuum:
- Acceptance check:
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: Setup of thr ion pumps.
- Heater control: Test in IXV/EXV.
- TMS:
Discussion
VIS Meeting
Date: 2022/3/25 14:00-14:10
Participants: Takahashi, Terrence, Ishizaki, Tanaka, Ushiba
Summary Report
Type-A
- Recovery of EY is ongoing. Though the F2 was rotated much enough to avoid touching the pole, there are still DC couplings between the F0 and F1.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A team: Recovery of EY.
- Type-B team:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/28
- Takahashi: 3/28-4/1
- Sato: 3/28-4/1
- Hirata: 3/29-4/1
The week from 4/4
- Takahashi: 4/5-8
- Sato: 4/5-8
- Hirata: 4/5-8
Next meeting
- 2022/4/1(FRI)