Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2022/5/6 13:00-14:00
Participants: Takahashi, Node, Kimura, Uchiyama, Aso, Akutsu, Ushiba
Schedule
- IX: F3 GAS glitch.
- EX:
- IY: Finalization. Height adjustment. Health check. Cabling check. H2 geophone noise. Thermometer.
- EY: Finalization. Health check. IM V3 cabling. BF LVDT noise. Cabling check (P7-2 upperside). ADC noise on MN/IM PS.
- Type-B: Health check in SR3. Calibration of geophone in SR2. Stand-alone SM driver for SR3.
- Type-Bp: Traverser limit SW. FC onto PRM.
- Type-C: OMC installation from 5/23.
Status
- Replacement of flip cables: Cables for TMS.
- TM height setting: ITMY.
- Oplev: Windshield in the next.
- ACC:
- Commissioning in air:
- Commissioning in vacuum:
- Acceptance check: Review from 5/13.
- PF actuator: At the in-vacuum commissioning.
- New vacuum pumps for V-chambers: How to treat thermal load?
- Heater control: Pending.
- TMS: Thermometer
Cryo-shield: Finnese measurement, height check --> Cooler ON.
Discussion
VIS Meeting
Date: 2022/5/6 14:00-14:10
Participants: Takahashi, Washimi, Uchiyama, Aso, Ushiba
Summary Report
Type-A
- Height adjustment of ITMY/ETMY.
Type-B
- TF measurement in SR3.
Type-Bp
- Preparation for the traverser limit switches.
Type-C
Electronics
Control
Schedule
See Schedule
- Type-A: Finalization in IY/EY.
- Type-B/Bp/C: FC onto PRM, Alignment of SR3/OMMC.
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 5/9
- Takahashi: 5/9-13
- Sato: 5/9-13
- Hirata: 5/9-13
The week from 5/16
- Takahashi: 5/17-20
- Sato: 5/17-20
- Hirata: 5/17-20
Next meeting
- 2022/5/13(FRI)