Agenda/Minutes

Zoom Meeting


CRY+VIS Interface Meeting

Date: 2022/9/2 13:00-

Participants:

Post O3 Upgrade portal

Schedule

Status

Discussion


VIS Meeting

Date: 2022/9/2 14:00-

Participants:

Summary Report

Type-A

Type-B

* In BS, the IM picomotor cable was checked because pin 8 has a connection to ground. It was determined that the problem is deep within the chamber, and we cannot fix it from outside. The yaw picomotor should still be functional because such a pin is connected to ground at the driver.

Type-Bp

Type-C

Electronics

Control

Schedule

Safety

Discussion

Travel Plans

(Date in Kamioka)

The week from 9/5

The week from 9/12

Next meeting