Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/1/13 13:00-
Participants:
Status
- Type-A: Heater control in IY. IM L2P decoupling in EX.
- Type-B: F0 sensor correction in SR3.
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC: Replacement of LPC in IY.
- Commissioning:
- Vacuum system:
- Heater control: Adjustment in IY
- TMS:
Discussion
VIS Meeting
Date: 2023/1/13 13:30-
Participants:
Summary Report
Type-A
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: Investigation of ACCs.
- Type-B/Bp: Vertical sensor correction.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 1/16
Next meeting
- 2023/1/20(FRI) 13:30-