Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/3/24 13:00-
Participants:
Status
- Type-A: Offloading and heater control in EX. Sensor correction in IY.
- Type-B: Sensor correction in BS.
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC: Replacement of the coil driver in EY.
- Commissioning:
- Vacuum system:
- Heater control: Using in IY and EX.
- TMS:
Discussion
VIS Meeting
Date: 2023/3/24 13:30-
Participants:
Summary Report
Type-A
- Turned the heater on and offloaded the F0 in EX.
- Investigating the performance of the sensor correction.
Type-B
Type-Bp
Type-C
Electronics
Control
Schedule
- Type-A: IP control with ACCs.
- Type-B/Bp: BS sensor correction and blending.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 3/27
Next meeting
- 2023/3/31(FRI) 13:30-