Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/4/7 13:00-13:15
Participants: Takahashi, Miyaki, Aso, Ikeda, Sato, Mitsuhashi, Yokozawa, Ushiba, Uchiyama, Akutsu, Hirata
Status
- Type-A: Test of the IP control with ACCs.
 - Type-B:
 - Type-Bp: Damping control for GAS filters should be optimized.
 - Type-C: Offload in IMMT1. Oplev centering would be necessary.
 
Other items
- Oplev: Investigation of glitches is planned.
 - ACC: Test of the IP control with ACCs.
 - Commissioning: Measurements of DAC noise.
 - Vacuum system: 6 TMPs should be stopped in the center.
 - Heater control:
 - TMS:
 
Discussion
VIS Meeting
Date: 2023/4/7 13:30-13:45
Participants: Takahashi, Mitsuhashi, Ushiba, Uchiyama, Sato, Tanaka, Hirata
Summary Report
Type-A
- Tested the IP control with ACCs in IY.
 
Type-B
Type-Bp
- Damping control for GAS filters should be optimized.
 
Type-C
Electronics
- Measurements of ADC noise are required every Friday.
 
Control
R&D
Schedule
- Type-A: Replacement of the coil driver for ACC in EX.
 - Type-B/Bp:
 - Type-C:
 
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 4/10
- Aso: 4/10-12
 - Takahashi: 4/13-14
 - Mitsuhashi: 4/13-14
 - Fabian: 3/27-4/18 (vacation)
 
Next meeting
- 2023/4/14(FRI) 13:30-
 
