Contents
Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/4/21 13:00-13:10
Participants: Takahashi, Mitsuhashi, Miyoki, Yokozawa, Ikeda, Ushiba, Akutsu, Sato, Node
Suspensions
- Type-A: Replacement of the coil driver in EX.
- Type-B: Measurement of the DAC noise in BS.
- Type-Bp: Optimization of the damping control.
- Type-C:
Other items
- Oplev: Air conditioner in IXC was making the glitches.
- ACC: Modification of LPCD.
- Commissioning: Measurements of DAC noise.
- Vacuum system:
- Heater control:
- TMS:
Discussion
VIS Meeting
Date: 2023/4/21 13:30-13:40
Participants: Takahashi, Mitsuhashi, Fabian, Tanaka
Summary Report
Type-A
- Returned the HPCD back for the accelerometers in EX.
Type-B
Type-Bp
- Optimizing the damping control for the BF damper.
Type-C
Electronics
Control
R&D
Schedule
- Type-A:
- Type-B: Measurements in SRs.
- Type-Bp: Damping control for BF damper.
- Type-C:
Safety
Discussion
Travel Plans
(Date in Kamioka)
The week from 4/24
- Sato: 4/28
- Hirata: 4/28
Next meeting
- 2023/4/28(FRI) 13:30-