Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2023/6/16 13:00-13:30
Participants: Takahashi, Mitsuhashi, Yokozawa, Uchiyama, Aso, Miyoki, Ushiba, Kimura
Suspensions
- Type-A:
- Type-B:
- Type-Bp:
- Type-C:
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Every Friday from 7/7.
- Measurements on the sensor correction in SR2.
- Optimization of the damping control in PRs: Concrete plan and schedule are necessary.
- IP control with the ACCs.
- In-vacuum accelerometer for IOO: PEM started the examination. The geophone will be installed into the OMC chamber. He gas should be enclosed in the pod.
- Hight adjustments of Type-A in the cooling.
- Measurement of the drum-head modes: 6/28 or 30.
- Check of the length Oplev.
- Noise budget of the cryo-payloads.
- Temperature control for the Oplev: Preparing for the heater controller.
- Check of the space in the IMM chamber: Ask Sato-san to check the drawings.