Agenda/Minutes
CRY+VIS Interface Meeting
Date: 2024/1/26 13:00-
Participants:
Suspensions
- Type-A: Health check.
- Type-B: Health check.
- Type-Bp: Recovery of PRM.
- Type-C: Recovery of IMC.
Other items
- Oplev:
- ACC:
- Commissioning:
- Vacuum system:
- Heater control:
- TMS:
Post O4a
- Measurements of the DAC noise: Type-C.
- Optimization of the damping control in PRs:
- IP control with the ACCs:
- In-vacuum accelerometer for IOO: No space to put the geophone pod in the IFI chamber.
- Height adjustments of Type-A in the cooling:
Discussion
- Recovery of Type-A.