VIS Meeting
Date: 2024/7/5 10:00-
Participants: Ushiba, Aso, Washimi, Tanaka, Sato
Topics
Recovery of OMC Stack
- The wire was cut when we locked the IM in the OSTM suspension.
- The mirror has been rotated when we rehung it in the OSTM suspension.
- There was no margin to adjust the height of the optical bench.
- There was a miscommunication on the attachment of the black panels.
- Considering the actual access, the OMMT1 suspension was too heavy to install from the Y+ side.
- The guide rod was bent and the M6 thread was damaged.
- One screw to fix the EQ stopper plate was lost.
- In-vacuum cables were not anchored to the SUS blocks owing to the short ones.
- The roof doors were connected to each other.
- The spare geophone did not work.
- The frame with the C-cramps damaged the O-ring.
- Evaluation
Type-A
- IP controls using ACCs
Type-B/Bp
- BF damper for Type-B
- IP for Type-Bp
Type-C
- Active isolation table: ATC
R&D
- Protection from earthquakes
Application for Kakenhi (Memo)
Discussion
Next meeting
- 2024/7/19 10:00-