VIS Meeting
Date: 2024/8/2 10:00-10:30
Participants: Takahashi, Ushiba, Aso, Sato
Topics
Type-A
- IP controls using ACCs
Type-B/Bp
- IP control of SR3.: Done
- BF damper for Type-B.
- IP for Type-Bp.
Type-C
- OMC stack.: Change the number of stages from 3 to 1-2. The performance should be evaluated using the prototype beforehand.
- Active isolation table for OMC: by ATC, Design in 2024FY, Procurement and assembly in 2025FY, Evaluation and installation from 2026 spring-summer.
R&D
- Protection from earthquakes
Application for R7 Kakenhi (Memo)
Discussion
Next meeting
- 2024/8/16 10:00-