Contents
VIS Meeting
Date: 2025/10/24 10:00-10:15
Participants: Aso, Washimi, Yokozawa, Sato, Ushiba, Akutsu, Takahashi
Topics
Type-A
- ACCs for the IP controls.
Evaluating the FLDACC with DGS in ATC (report).
Type-B/Bp
- IRM damper for Type-B.
In-vacuum cables have been made. The actuator coefficient was measured (report).
- Enclosure for the SG card in an independent box.
- Preparing for the boxes with a 1U rack panel.
- IP for Type-Bp.
- Started a design.
Type-C
- Active isolation table for OMC.
- Small Type-C suspensions with mini-GAS.
R&D
Discussion
Next meeting
- 2025/11/7 10:00-
