Contents
VIS Meeting
Date: 2026/6/5 10:00-
Participants: Aso, Ushiba, Yokozawa, Akutsu, Sato, Takahashi
Topics
Type-A
- Offload of GAS filters
- IP controls
- Recovery of the FLDACCs in EY.
Type-B/Bp
SRM (Notion page)
FLDACC: IP control
- IRM damper: Design the servo filter.
- PR3
IM H3 OSEM: Glitch
- SG card box.
- IP for Type-Bp.
- Started a design.
Type-C
Active isolation table for OMC. (Notion page)
- Maraging steel was delivered.
- Considering the bottom structure to support the baseplate with the cone bellows on the jack.
- Start the preparation for the DGS.
- Check the stock of the LVDT drivers.
- Small Type-C suspensions with mini-GAS.
- Application for the present MC suspensions should be considered.
R&D
- Development of a hybrid low-frequency vibration isolation system.
- Modification of the Type-A tower toward O6.
Discussion
Next meeting
- 2026/6/19 10:00-
