Differences between revisions 10 and 179 (spanning 169 versions)
Revision 10 as of 2009-06-01 18:22:39
Size: 448
Comment:
Revision 179 as of 2018-05-24 15:30:57
Size: 1544
Editor: RyoheiKozu
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''防振系''' ## page was renamed from LCGT/subgroup/vis
<<TableOfContents(3)>>
Line 3: Line 4:
リーダー: 高橋竜太郎 (NAOJ) == Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF),R. Kozu(ICRR)
Line 5: Line 9:
サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) ----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 7: Line 14:
----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 8: Line 18:
''第1回LCGT防振系作業部会'' [[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 10: Line 20:
6月3日(水) 17:00-19:00 天文台輪講室 [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 12: Line 22:
・[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 14: Line 24:
・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] [[KAGRA/Subgroups/VIS/Payload|Payload]]
Line 16: Line 26:
・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-Cryo接続部]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]
Line 18: Line 28:
・R&Dについて [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF),R. Kozu(ICRR)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)