Differences between revisions 169 and 176 (spanning 7 versions)
Revision 169 as of 2015-11-02 05:36:32
Size: 1103
Editor: YoichiAso
Comment:
Revision 176 as of 2017-01-30 11:51:11
Size: 1408
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
Type-B [[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 22: Line 22:
Type-C [[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 26: Line 26:
iKAGRA TM [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]
Line 33: Line 35:
 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
Line 36: Line 39:

----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Operation


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)