Size: 1233
Comment:
|
Size: 1519
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 26: | Line 26: |
iKAGRA TM | [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] |
Line 35: | Line 37: |
== Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- |
|
Line 37: | Line 42: |
---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] |
Contents
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
Design
Installation
Real Time Model Development
Operation
Archives
Old Weekly EVO Meeting
- This meeting is suspended.