Size: 1352
Comment:
|
Size: 1635
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
. Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ), | . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), |
Line 28: | Line 28: |
[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] |
|
Line 35: | Line 37: |
== Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- |
|
Line 37: | Line 42: |
---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] |
Contents
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
Design
Installation
Real Time Model Development
Operation
VIS Introductioon
Archives
Old Weekly EVO Meeting
- This meeting is suspended.