Differences between revisions 25 and 179 (spanning 154 versions)
Revision 25 as of 2009-06-08 11:30:04
Size: 944
Editor: whitehole
Comment:
Revision 179 as of 2018-05-24 15:30:57
Size: 1544
Editor: RyoheiKozu
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
|| '''[[LCGT|PROJECT TOP]]''' ||[[LCGT/subgroup/analysis|GW Analysis]] ||[[LCGT/subgroup/ifo|Interferometer]] ||[[LCGT/subgroup/vacuum|Vacuum & Cryostat]] ||[[LCGT/subgroup/laser|Laser & Optics]] ||[[LCGT/subgroup/vis|Seismic Isolator]] ||[[LCGT/subgroup/infra|Infrastructure]] ||
## page was renamed from LCGT/subgroup/vis
Line 5: Line 4:
== 防振系 == == Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF),R. Kozu(ICRR)
Line 7: Line 9:
 常温防振+ヒートリンク+低温懸架 ----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 9: Line 14:
 リーダー: 高橋竜太郎 (NAOJ) <<BR>> ----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 11: Line 18:
 サブリーダー: 内山隆 (ICRR)、三代木伸二 (ICRR) [[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 13: Line 20:
[[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 14: Line 22:
=== TAMA SAS の問題点 ===
 . [[LCGT/subgroup/vis/tama_sas|Item list to be improved]]
[[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 17: Line 24:
=== 第1回LCGT防振系作業部会 === [[KAGRA/Subgroups/VIS/Payload|Payload]]
Line 19: Line 26:
 6月3日(水) 17:00-19:00 天文台輪講室 [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]
Line 21: Line 28:
 [[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]
Line 23: Line 30:
 [[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]]) ----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]
Line 25: Line 35:
 [[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-低温接続部]]  . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Real Time Model Development ==
 . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]
Line 27: Line 43:
 R&Dについて ----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF),R. Kozu(ICRR)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Real Time Model Development


Operation


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)