Differences between revisions 3 and 176 (spanning 173 versions)
Revision 3 as of 2009-06-01 18:03:15
Size: 378
Comment:
Revision 176 as of 2017-01-30 11:51:11
Size: 1408
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
'''防振''' ## page was renamed from LCGT/subgroup/vis
<<TableOfContents(3)>>
Line 3: Line 4:
リーダー: 高橋竜太郎 (NAOJ) == Vibration Isolation ==
 . Chief: R. Takahashi (NAOJ)
 . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),
 T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
Line 5: Line 9:
サブリーダー:内山隆 (ICRR)、三代木伸二 (ICRR) ----
== VIS Meeting ==
 . Every Friday, from 13:30 (JST)
 . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]]
Line 7: Line 14:
第1回LCGT防振系作業部会 ----
== Design ==
[[KAGRA/Subgroups/VIS/TypeA|Type-A]]
Line 9: Line 18:
・[[attachment:LCGT/subgroup/vis/agenda1.doc|作業班、スケジュール]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]]
Line 11: Line 20:
・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]]
Line 13: Line 22:
・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.doc|常温-Cryo接続部]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]]
Line 15: Line 24:
・R&D [[KAGRA/Subgroups/VIS/Payload|Payload]]

[[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]]

[[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]]

----
== Installation ==
 . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]]
 . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]]

 . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]]
----
== Operation ==
 . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]]

----
== Archives ==
 . [[KAGRA/Subgroups/VIS/Photos|Photos]]

----
== Old Weekly EVO Meeting ==
 . This meeting is suspended.

[[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]]

Vibration Isolation

  • Chief: R. Takahashi (NAOJ)
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)


VIS Meeting


Design

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs


Installation


Operation


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)