Size: 430
Comment:
|
Size: 1947
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
'''防振''' | ## page was renamed from LCGT/subgroup/vis |
Line 3: | Line 3: |
リーダー: 高橋竜太郎 (NAOJ) | = VIS = |
Line 5: | Line 5: |
サブリーダー:内山隆 (ICRR)、三代木伸二 (ICRR) | '''V'''ibration '''I'''solation '''S'''ystem is the infrastructure for the optics in the KAGRA interferometer. |
Line 7: | Line 7: |
''第1回LCGT防振系作業部会'' | <<TableOfContents(3)>> |
Line 9: | Line 9: |
6月3日(水) 17:00-19:00 天文台輪講室 | == Vibration Isolation == . Chief: R. Takahashi (NAOJ) . Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ), T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF) |
Line 11: | Line 14: |
・[[attachment:LCGT/subgroup/vis/agenda1.pdf|作業班、スケジュール]] | ---- == VIS Meeting == . Every Friday, from 13:30 (JST) . [[KAGRA/Subgroups/VIS/MeetingNAOJ|Meeting Page]] |
Line 13: | Line 19: |
・[[attachment:LCGT/subgroup/vis/ICDsas.doc|ICD]] | ---- == VIS Upgrades == |
Line 15: | Line 22: |
・[[attachment:LCGT/subgroup/vis/LCGT-SAS2.pdf|常温-Cryo接続部]] | [[KAGRA/Subgroups/VIS/Upgrade|Upgrade Page]] |
Line 17: | Line 24: |
・R&D | ---- == Design == [[KAGRA/Subgroups/VIS/TypeA|Type-A]] [[KAGRA/Subgroups/VIS/TypeB|Type-B]] [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] [[KAGRA/Subgroups/VIS/Type-C|Type-C]] [[KAGRA/Subgroups/VIS/Payload|Payload]] [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator design summary]] [[KAGRA/Subgroups/VIS/ChangeLog|Design Change Logs]] ---- == Installation == . [[KAGRA/Subgroups/VIS/IstManual|Installation Procedure]] . [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc. Installation Work Information]] . [[KAGRA/Subgroups/VIS/iKAGRAbKAGRA|Tasks from iKAGRA to bKAGRA]] ---- == Real Time Model Development == . [[KAGRA/Subgroups/VIS/RealTimeModel|Real-time Model Development]] ---- == Operation == . [[KAGRA/Subgroups/VIS/OpsManual|Operation Manual]] ---- == VIS Introductioon == . [[KAGRA/Subgroups/VIS/Introduction|Introduction materials for VIS]] ---- == VIS Commissioning == . [[KAGRA/Subgroups/VIS/Type-A/Commissioning|Type-A Commissioning]] ---- == Archives == . [[KAGRA/Subgroups/VIS/Photos|Photos]] ---- == Old Weekly EVO Meeting == . This meeting is suspended. [[KAGRA/Subgroups/VIS/OldVISMeetings|Past minutes]] |
VIS
Vibration Isolation System is the infrastructure for the optics in the KAGRA interferometer.
Contents
Vibration Isolation
- Chief: R. Takahashi (NAOJ)
- Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),
T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)
VIS Meeting
- Every Friday, from 13:30 (JST)
VIS Upgrades
Design
Installation
Real Time Model Development
Operation
VIS Introductioon
VIS Commissioning
Archives
Old Weekly EVO Meeting
- This meeting is suspended.