20180604
Today's activities
Workers: Ikenoue, Simon, S. Saitou, Akutsu
- Prepared the shipping.
- Wrapped the NAB and took out from the large clean room of ATC in NAOJ.
- There was a level difference of the floor at the large door of the clean room, and we needed to use an engine crane to overcome that.
- Brought the wrapped whole suspension to the experiment room by its wheels.
- Wrapped by aluminum moisture-proof sheet; input RP-3ANC in it.
- Put into a wooden box, and closed the openings with nails.
- Wrapped the NAB and took out from the large clean room of ATC in NAOJ.
Next plan