Line 7: Line 7:

== To be modified and wanted
 * Ballast masses
 * Wire heads holders
 * Damper plates
 * Grooves to show the center line at the ears

Narrow Angle Baffle

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

== To be modified and wanted

  • Ballast masses
  • Wire heads holders
  • Damper plates
  • Grooves to show the center line at the ears

Task list

Note: some of the tasks can be done in parallel.

  • Make the clean booth clean and useful; prepare tables, shelves, ethanol, tools...
  • Open the side flanges and top lid; attach white tapes (SPV-202) to the open flanges to protect them.
  • Check the positions and rigidity of the inner tower, and the dirtiness.
  • Check also fixing method for the inner tower; at least in IXAm it seems re-working is needed.
  • Measure several heights and widths
  • Make grooves to be references so that we can locate the NAB properly with respect to the interferometer's main beam.