6654
Comment:
|
6761
|
Deletions are marked like this. | Additions are marked like this. |
Line 15: | Line 15: |
||<style="background-color: #F0F0FF;">'''Observation'''||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]](3/15-31, 4/11-25)|| | ||<style="background-color: #F0F0FF;">'''Observation'''||[[KAGRA/Observation|Observation top]]<<BR>> [[KAGRA/Observation/iKAGRA|iKAGRA observation]] (3/15-31, 4/11-25)|| |
Line 21: | Line 21: |
<<Anchor(access)>> | |
Line 22: | Line 23: |
* Bus time table ([[attachment:Bus_time_table_Toyama_Mozumi_20151001.pdf|Toyama > Mozumi(from Oct 1)]], [[attachment:Bus_time_table_Toyama_Mozumi.pdf|Toyama > Mozumi(until Sept.30)]]),([[attachment:Bus_time_table_Mozumi_Toyama_20151001.pdf|Mozumi > Toyama(from Oct 1)]], [[attachment:Bus_time_table_Mozumi_Toyama.pdf|Mozumi > Toyama(until Sept.30)]]) | * Bus/Train time table ([[attachment:Bus_time_table_Toyama_Mozumi_20151001.pdf|Toyama > Mozumi(from Oct 1, 2015)]], [[attachment:Bus_time_table_Toyama_Mozumi.pdf|Toyama > Mozumi(until Sept.30, 2015)]]),([[attachment:Bus_time_table_Mozumi_Toyama_20151001.pdf|Mozumi > Toyama(from Oct 1, 2015)]], [[attachment:Bus_time_table_Mozumi_Toyama.pdf|Mozumi > Toyama(until Sept.30, 2015)]]) |
Line 26: | Line 27: |
* YUKI house, accomodation in KAMIOKA: | * Accommodation during KAGRA stay: YUKI house/Loco motion at Osawano: |
Line 28: | Line 29: |
* [[attachment:Access to YUKI-house.pdf|Access]] * [[attachment:HowtouseYUKI-house-in Japanese.pdf|How to use]] |
* [[attachment:Access to YUKI-house.pdf|Access to Yuki house]] * [[attachment:HowtouseYUKI-house-in Japanese.pdf|How to use Yuki house]] |
KAGRA Wiki
News
13th Kagra Face 2 Face meeting will be held on Feb. 21-23. Registration page
Public lecture series for the 100th Anniversary of General Relativity
iKAGRA Observation page top (Observation: 3/15-31, 4/11-4/25)
Meetings |
KAGRA collaboration meeting |
Documents |
KAGRA log |
Task management |
Tools |
How to upload documents to JGWDoc (Japanese, English) |
|
Observation |
Observation top |
Site information
TV meeting room at Hokubu-kaikan: Reservation page
- Accommodation during KAGRA stay: YUKI house/Loco motion at Osawano:
How to take garbage away in KAGRA site (in Japanese): Manual
Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form
Publication Policy
CPC publication policy (inc. the procedure to submit for the JSPS meetings)
Technical information
Table of KAGRA location (Table)
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
16 |
Detector Characterization |
DEC |
||
** |
Advanced R&D |
|
|
|
** |
NAOJ Test alog |
(NAOJ) |
|
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
Target Sensitivity of bKAGRA
KAGRA Documents
Others
Misc. (tools, past discussions, etc.)