8436
Comment:
|
8563
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
* [[KAGRA/Meeting/F2F|the 18th F2F meeting at Tokyo Tech]] (registration deadline: 11/24) * Commissioning started: [[KAGRA/Commissioning|Wiki page]] |
* bKAGRA phase1 operation from 4/28 to 5/6: See [[KAGRA/Commissioning/Phase1/Operation|wiki page]] * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/f2f/2018May|The 19th KAGRA face-to-face meeting]] at Osaka City University, May 18(Fri)-20(Sun). registration deadline: April 30. |
Line 28: | Line 29: |
* [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918&version=3|Bus/Train time table (From April 1, 2017 (JR from March 4, 2017))]] | * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=4918|Bus/Train time table (From April 1, 2018 (JR from March 17, 2018))]] |
Line 37: | Line 38: |
* Locomotion (Note! No network for G 205,I 205) | * Locomotion (Note! No network for G 205) |
Line 39: | Line 40: |
* [[attachment:20171012_Locomotion_Manual_J.pdf|Locomotion Manual (Japanese)]][[attachment:20160215_Locomotion_Manual.pdf|(English)]] | * [[attachment:20171012_Locomotion_Manual_J.pdf|Locomotion Manual (Japanese)]][[attachment:20171101 Locomotion Manual_e.pdf|(English)]] |
KAGRA Wiki
News
bKAGRA phase1 operation from 4/28 to 5/6: See wiki page
The 19th KAGRA face-to-face meeting at Osaka City University, May 18(Fri)-20(Sun). registration deadline: April 30.
Meetings |
KAGRA collaboration meeting |
Documents |
KAGRA log |
Task management |
Site Shift schedule |
Tools |
How to upload documents to JGWDoc (Japanese, English) |
Commissioning |
Observation |
Observation top |
|
KSC |
|
Site information
ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks.
- Accommodation during KAGRA stay: YUKI house in Kamioka / Locomotion in Osawano:
- YUKI house
- Locomotion (Note! No network for G 205)
How to take garbage away in KAGRA site (in Japanese): Manual
How to work at the KAGRA site?
Material of morning meeting in the Dropbox folder (in Japanese): Take a file named today's date.
Application to enter the KAGRA mine: Application page
How to purchase items you need (in Japanese): Proceedure
Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form
TV meeting room at Hokubu-kaikan: Reservation page
Reservation for the Koach Filters
Publication Policy
CPC publication policy (inc. the procedure to submit for the JSPS meetings)
Technical information
Table of KAGRA location (Table)
Subsystems
|
Subgroup name |
Links |
||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
16 |
Detector Characterization |
DET |
||
17 |
Calibration |
CAL |
|
|
** |
Advanced R&D |
|
|
|
** |
NAOJ Test alog |
(NAOJ) |
|
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
Target Sensitivity of bKAGRA
Sensitivity data can be downloaded from JGW-T1707038
Website about the KAGRA sensitivity is here.
Parameter list is here.
KAGRA Documents
Others
Misc. (tools, past discussions, etc.)