Size: 4625
Comment:
|
Size: 4625
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
. [[KAGRA/Workshop/Toyama/2012|Workshop at Toyama Univ.]] at July 7, 2012 | . [[KAGRA/Workshop/Toyama/2012|Workshop at Toyama Univ.]] on July 7, 2012 |
KAGRA Wiki
News
Workshop at Toyama Univ. on July 7, 2012
Meetings |
KAGRA collaboration meeting |
Documents |
|
Special WG' |
KAGRA Roadmap |
Tools |
KAGRA conference calendar |
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
|
|
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
|
|
12 |
Digital System |
DGS |
||
13 |
Data Analysis |
DAS |
|
|
14 |
Geophysics Interferometer |
GIF |
|
|
** |
Detector Characterization |
DC |
Project time-line
Time-line chart is here (password protected).
iKAGRA wiki: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
bKAGRA wiki: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Official Sensitivity of bKAGRA
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)