KAGRA Wiki
News
- The 22nd Face to Face Meeting @ ICRR, Kashiwa, Chiba, Apr 19 (Fri) - 21 (Sun), 2019. - Thanks for your contributions.  
 
- Thanks for your contributions.  
- Observation 3 information page (Schedule & News / Your action items / Collaboration MoU / Commitment form) 
- The 6th KAGRA International workshop: at Wuhan, China, 2019 June 21 (Fri) - 23 (Sun). - web site is open! 
- The important deadlines are:   - deadline of abstract and poster : May 20, 2019
- deadline of hotel reservation : May 20, 2019
 
 
- The 23rd KAGRA Face-to-Face meeting: at Univ. Toyama, 2019 August 22 (Thur) - 24 (Sat). - Mark your calendar.
 
| Meetings | KAGRA collaboration meeting  | Documents | KAGRA log (klog)  | 
| Task management | Site Shift schedule | Tools | How to upload documents to JGWDoc (Japanese, English) | 
| Commissioning | Observation | Observation top | 
| Safety and Activity Control | 
KAGRA Scientific Congress (KSC)
| KSC | |
| KSC newsletter | No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April) | 
| Rules and Regulations | 
Site information
- ATTENTION! No stores in Mozumi(KAGRA site area). Please bring your own food and drinks. 
- Accommodation during KAGRA stay: YUKI house in Kamioka / Locomotion in Osawano: - YUKI house
- Locomotion
 
- How to take garbage away in KAGRA site (in Japanese): Manual 
How to work at the KAGRA site?
- Material of morning meeting in the Dropbox folder (in Japanese): Take a file named today's date. 
- Application to enter the KAGRA mine: Application page 
- How to purchase items you need (in Japanese): Proceedure 
- Application for requesting mine work to Kamioka-kougyo (in Japanese): Application form 
- 1F TV meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page 
- 2F meeting room at Kenkyu-to(Hokubu-kaikan): Reservation page 
- Reservation for Zoom 
- Reservation for the Koach Filters 
Publication Policy
- CPC publication policy (inc. the procedure to submit for the JSPS meetings) 
Technical information
- Table of KAGRA location (Table) 
Subsystems
| 
 | Subgroup name | Links | ||
| 1 | Tunnel | TUN | ||
| 2 | Facility | FCL | 
 | |
| 3 | Vacuum | VAC | 
 | |
| 4 | Cryogenics | CRY | ||
| 5 | Vibration Isolation | VIS | ||
| 6 | Mirror | MIR | 
 | |
| 7 | Laser | LAS | 
 | |
| 8 | Main Interferometer | MIF | 
 | |
| 9 | Input/Output Optics | IOO | ||
| 10 | Auxiliary Optics Subsystem | AOS | ||
| 11 | Analog Electronics | AEL | ||
| 12 | Digital System | DGS | ||
| 13 | Data Management | DMG | 
 | |
| 14 | Data Analysis | DAS | 
 | |
| 15 | Geophysics Interferometer | GIF | 
 | |
| 16 | Detector Characterization | DET | ||
| 17 | Calibration | CAL | 
 | |
| 18 | Physical Environment Monitors | PEM | 
 | |
| ** | Advanced R&D | 
 | 
 | |
| ** | NAOJ Test alog | (NAOJ) | 
 | |
* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.
Target Sensitivity of bKAGRA
- Sensitivity data can be downloaded from JGW-T1707038 
- Website about the KAGRA sensitivity is here. 
- Parameter list is here. 
KAGRA Documents
Others
- Misc. (tools, past discussions, etc.) 
- Materials for Visitors Slides, Posters etc. to guide visitors of KAGRA 
- KAGRA CG Illustrations Stunning CG Illustrations by Rey.Hori 




