Differences between revisions 20 and 21
Revision 20 as of 2011-01-14 14:00:39
Size: 3393
Comment:
Revision 21 as of 2011-01-14 14:07:43
Size: 3440
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
If you will attend the LCGT f2f meeting, please visit below page. If you will attend the LCGT f2f meeting, please visit below page by January 27 (one week before the meeting).
Line 24: Line 24:
We plan to have a banquet in the evening on February 4(Fri). Please put 'yes' at the box of question about attending banquet on the registration page and pay the fee JPY3500 at the front desk of conference if you attend the banquet. We plan to have a banquet in the evening on February 4(Fri). Please put 'yes' in the box about attending banquet on the registration page and pay the fee JPY3500 at the front desk of conference if you attend the banquet.
Line 26: Line 26:
If you plan to stay at the lodge of Kashiwa-campus of ICRR, U-Tokyo, please put the dates you hope to stay on a box of accommodation on the registration page. Note that we have limited number of rooms, so please register ASAP if you are thinking to stay. If you plan to stay at the lodge in Kashiwa-campus of ICRR, U-Tokyo, please put the dates you hope to stay in the box about accommodation on the registration page. Note that we have limited number of rooms, so please register ASAP if you are thinking to stay at campus.

LCGT face to face meeting


Date: February 4(Fri)-5(Sat), 2011

Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference room

http://www.icrr.u-tokyo.ac.jp/access/index_eng.html

We spent much time in the last year in order to meet the tight schedule set by the Government research fund with estimated longer construction time of LCGT after being informed of the partial financing of LCGT. Finally, we have determined the right direction for the fulfillment of the project. The initial phase LCGT (iLCGT) will be operated without cryogenic mirror system for this requirement in prior to the baseline LCGT (bLCGT) which will be in operation by 2016 realizing the baseline specification of LCGT. Although the original design of LCGT was completed ten years ago, LCGT is still competitive among other advanced detectors such as advanced LIGO and advanced Virgo. This means that the techniques of LCGT are quite challenging and not easy to be realized.

We are ready to make this non-easy project successful under the condition of short manpower and possibly short money utilizing wide support by the international community of gravity wave research. We have exchanged MOU with LIGO and in a process of agreement with Virgo. Also we are trying to find new collaboration members to augment LCGT manpower. Under the MOU with LIGO, two researchers have already visited ICRR last fall to support the design of LCGT.

I hope that this f2f meeting presents a good opportunity to mutually exchange a firm resolution to the success of great challenge of LCGT.

Kazuaki Kuroda


Registration

If you will attend the LCGT f2f meeting, please visit below page by January 27 (one week before the meeting).

Link to Registration page

We plan to have a banquet in the evening on February 4(Fri). Please put 'yes' in the box about attending banquet on the registration page and pay the fee JPY3500 at the front desk of conference if you attend the banquet.

If you plan to stay at the lodge in Kashiwa-campus of ICRR, U-Tokyo, please put the dates you hope to stay in the box about accommodation on the registration page. Note that we have limited number of rooms, so please register ASAP if you are thinking to stay at campus.


Program

February 4(Fri.)

11:00~

Plenary session (chair:I.Nakatani)

Project Status

K.Kuroda [30min]

Sience of LCGT

Tagoshi [30min]

12:00~

Lunch

13:00~

Report from subgroups 1 (chair: M.Ando)

18:00~

Banquet

February 5(Sat.)

9:00~

Joining the LCGT collaboration (chair:K.Kuroda)

Shanghai Normal University 1

Shanghai Normal University 2

10:00~

Discussions for important items (chair: S.Kawamura)

12:00~

Lunch

13:00~

Report from subgroups 2 (chair: M.Ando)

14:00~

Report from Special working groups, and others (chair: N.Kanda)

LCGT Roadmap

Tunnel tilt

16:00~

Closing session


LCGT/Meeting/f2f/2011Feb (last edited 2011-06-17 00:47:27 by OsamuMiyakawa)