Line 36: Line 36:
||12:00~||||Lunch|| ||||||Lunch time 12:00~13:00||
Line 46: Line 46:
|| ||Shanghai Normal University 1|| ||
|| ||Shanghai Normal University 2|| ||
|| ||Shanghai Normal University, Shanghai United Center for Astrophysics 1||X.Zhai||
|| ||Shanghai Normal University, Shanghai United Center for Astrophysics 2||P.Xi||
Line 49: Line 49:
|| ||Teikyo University ||T.Ohmori|| || ||Teikyo University, Aerospace Engineering ||T.Ohmori||
||||||Break 10:20~10:30||
Line 58: Line 59:
||12:00~||||Lunch|| ||||||Lunch time 12:00~13:00||
Line 63: Line 64:
||14:00~||||Report from Special working groups, and others (chair: N.Kanda)|| ||13:30~||||Report from Special working groups, and others (chair: N.Kanda)||
Line 65: Line 66:
||||||Break 14:10~14:30||

LCGT face to face meeting


Date: February 4(Fri)-5(Sat), 2011

Location and access: ICRR U-tokyo, Kashiwa campus, 6F large conference room

http://www.icrr.u-tokyo.ac.jp/access/index_eng.html

We spent much time in the last year in order to meet the tight schedule set by the Government research fund with estimated longer construction time of LCGT after being informed of the partial financing of LCGT. Finally, we have determined the right direction for the fulfillment of the project. The initial phase LCGT (iLCGT) will be operated without cryogenic mirror system for this requirement in prior to the baseline LCGT (bLCGT) which will be in operation by 2016 realizing the baseline specification of LCGT. Although the original design of LCGT was completed ten years ago, LCGT is still competitive among other advanced detectors such as advanced LIGO and advanced Virgo. This means that the techniques of LCGT are quite challenging and not easy to be realized.

We are ready to make this non-easy project successful under the condition of short manpower and possibly short money utilizing wide support by the international community of gravity wave research. We have exchanged MOU with LIGO and in a process of agreement with Virgo. Also we are trying to find new collaboration members to augment LCGT manpower. Under the MOU with LIGO, two researchers have already visited ICRR last fall to support the design of LCGT.

I hope that this f2f meeting presents a good opportunity to mutually exchange a firm resolution to the success of great challenge of LCGT.

Kazuaki Kuroda


Registration

If you will attend this LCGT f2f meeting, please visit below page by January 27.

Link to Registration page

We plan to have a banquet in the evening on February 4(Fri). If you attend the banquet please put 'yes' in the box for attending the banquet on the registration page and pay the fee JPY3500 by cash at the front desk of conference.

If you plan to stay at the lodge in Kashiwa-campus of ICRR, U-Tokyo, please put the dates you hope to stay in the box for accommodation request on the registration page. Note that we have limited number of rooms, so please register ASAP if you are thinking to stay at campus.


Program

February 4(Fri.)

11:00~

Plenary session (chair:I.Nakatani)

Project Status

K.Kuroda [30min]

Sience of LCGT

Tagoshi [30min]

Lunch time 12:00~13:00

13:00~

Report from subgroups 1 (chair: M.Ando)

18:00~

Banquet

February 5(Sat.)

9:00~

Joining the LCGT collaboration (chair:K.Kuroda)

Shanghai Normal University, Shanghai United Center for Astrophysics 1

X.Zhai

Shanghai Normal University, Shanghai United Center for Astrophysics 2

P.Xi

Riccardo DeSalvo

Teikyo University, Aerospace Engineering

T.Ohmori

Break 10:20~10:30

10:30~

Discussions for important items (chair: S.Kawamura)

Collaboration with overseas project

K.Kuroda [20min]

Schedule of the LCGT meetings

K.Kuroda [10min]

Name and definition of subsystems

I.Nakatani [10min]

Review status

S.Kawamura [30min]

Research facility building at Kamioka

M.Ohashi [10min]

Lunch time 12:00~13:00

13:00~

Report from subgroups 2 (chair: M.Ando)

13:30~

Report from Special working groups, and others (chair: N.Kanda)

LCGT Roadmap

M.Ando [30min]

Break 14:10~14:30

Two layers tunnel

Uchiyama [15min]

Two layers SAS

R.Takahashi [15min]

Tunnel tilt

Kawamura [20min]

Requirements for LCGT

K.Somiya [30min]

16:00~

Closing session