20180227
Today's activities
Workers: Simon, Akutsu
Replaced a tentative breadboard supporting photosensors, a coil, and a burndy connector with a small but vacuum compatible one; see here.
- As described in the above link, the breadboard got rust during the natural dry after washing, so the rust was polished out and then again washed.
- Relocated the photosensors, the coil, and the burndy connector.
Measured with the coil injection; see here; needs more analysis.
Several couplings among the DoFs are observed and should be investigated which is which.
[Ongoing] Need cares of water springs from anchor bolts for oplev pylons.
[Ongoing] Need to confirm what are the scratch lines made by the measurement by the KEK team last week.
Next plan
- Complete the calibration of the oplev; the arm length was reported by Simon, so....
- Check the balance of the suspended WAB with some wires and sensors are attached.
- Check how the damping would be now after the replacement of the damping magnets.
- Check the reproducibility of the alignment of the suspension among several modes.
- Check heights of several points.
- Take care of water spring??
Wanted!
- Two burndy connectors, vacuum compatible.
Stages outside the chamber to ease wiping our legs.
Good rail(?) to move the WAB suspension in the cryostat in the main beam direction.
Chain block? to support the load in the chamber.
- A clock to know the time easily.
- M6 screw set.