Differences between revisions 132 and 139 (spanning 7 versions)
Revision 132 as of 2010-11-29 09:24:19
Size: 2475
Comment:
Revision 139 as of 2011-02-05 15:57:26
Size: 2758
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:

----
= News: =
== 3rd Face to face meeting: February 4-5, 2011 ==
 @ ICRR The Univ. of Tokyo Kashiwa campus 6F conference room

 *[[LCGT/Meeting/f2f/2011Feb|Program]]
Line 6: Line 13:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Subsystem reviews]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]|| ||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Review for Subsystems]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]||
Line 8: Line 15:
||[[/Meeting/Reviews|Reviews]]||Revew A,A',B,C||
Line 11: Line 17:
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)
Line 31: Line 39:
 .[[LCGT/Terminology|Terminology]]

LCGT wiki


News:

3rd Face to face meeting: February 4-5, 2011

  • @ ICRR The Univ. of Tokyo Kashiwa campus 6F conference room
  • Program


Meetings

Biweekly LCGT meeting
LCGT f2f meeting
Chief Meeting
Review for Subsystems

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki

Special WG

LCGT Roadmap
RSE Roadmap
IFO Bandwidth (~2009)
SPI study (~2009)

Documents

public
internal (password req.)
how to upload documents


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)