= Auxiliary Optics Subsystem (AOS) = = LCGT Auxiliary Optics Subsystem (AOS) =
Line 6: Line 6:
The objectives of the subgroup "Auxiliary Optics System" is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.
Line 8: Line 8:
== References and Links ==
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]||
|| ||[[LCGT/Terminology|Terminology]]||
== General Description ==
All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
Even if the vacuum chamber was not designed for considering the space allocated for AOS, AOS are required for fully operating LCGT, so we should pack them into the vacuum chambers '''''BY ANY MEANS'''''.

== References ==
||[[LCGT/subgroup/ifo/MIF/AuxOpticsLists|Aux. opt. list from MIF's point of view]]||[[LCGT/subgroup/vacuum|Layout Meeting]]|| ||
||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]]||[[LCGT/subgroup/OCG/parametermeeting|Parameter Meeting]]|| ||
||[[LCGT/SVN|LCGT SVN]] ||[[LCGT/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]||

== Subsystems ==
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control (incl.: beam baffles, output Faraday, calc. of BRDF...)]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|IR Pick-off and transmit telescopes]]
 * [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green Transmit Telescopes (Aux. locking system itself should be considered in MIF...)]]
 * [[LCGT/subgroup/AOS/OptLev1|Optical Lever]]
  * Optical lever is a kind of local sensors, but unlike other local sensors, it requires long beam lines as lever's arms, thus this should be considerd in AOS.
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment System]]
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]]
 * Other local sensors/monitors/actuators?
 * Any other optics, outside breadboard,...
 * Squeezing system??
 * Maybe mainly VIS group's charge and not AOS's:
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]

== Meetings ==
 * [[LCGT/subgroup/AOS/Meetings|LCGT-AOS Meetings]]
Line 14: Line 38:

== Meetings ==
[[LCGT/subgroup/AOS/Meetings|Meetings]]
== Links ==
 * [[https://dcc.ligo.org/|LIGO Document Control Center]]
 * [[https://www.advancedligo.mit.edu/aos.html|adv.LIGO Aux. Optics]]

LCGT Auxiliary Optics Subsystem (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed for considering the space allocated for AOS, AOS are required for fully operating LCGT, so we should pack them into the vacuum chambers BY ANY MEANS.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)