Differences between revisions 64 and 67 (spanning 3 versions)
Revision 64 as of 2011-08-29 06:01:34
Size: 2356
Comment:
Revision 67 as of 2011-08-29 06:23:06
Size: 2291
Comment:
Deletions are marked like this. Additions are marked like this.
Line 18: Line 18:
 * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control]]  * [[LCGT/subgroup/AOS/StrayLight1|Stray Light Control (incl.: beam baffles, output Faraday, calc. of BRDF...)]]
Line 21: Line 21:
 * [[LCGT/subgroup/AOS/StrayLight2|Output Faraday Isolaters]]
Line 24: Line 23:
 * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
 * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]
 * Other local sensors/monitors/actuators?
Line 29: Line 25:
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]]
 * Other local sensors/monitors/actuators?
 * Any other optics, outside breadboard,...
Line 30: Line 29:
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutter]]
 * [[LCGT/subgroup/AOS/Optics1|Any other optics, outside breadboard,... ]]
 * [[LCGT/subgroup/AOS/Mirror1|Micro Roughness of Mirrors]]
 * Mainly on VIS group's charge
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]

LCGT Auxiliary Optics Subsystem (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed for considering the space allocated for AOS, AOS are required for fully operating LCGT, so we should pack them into the vacuum chambers BY ANY MEANS.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)