Size: 2257
Comment:
|
Size: 2369
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 20: | Line 20: |
* [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green Transmit Telescopes]] | * [[LCGT/subgroup/AOS/BeamReduceTelescope2|Green Transmit Telescopes (Aux. locking system itself should be considered in MIF...)]] |
Line 23: | Line 23: |
* [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]] * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]] |
|
Line 31: | Line 29: |
* Maybe mainly VIS group's charge and not AOS's: * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]] * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]] |
LCGT Auxiliary Optics Subsystem (AOS)
Contents
Objectives
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.
General Description
All the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed for considering the space allocated for AOS, AOS are required for fully operating LCGT, so we should pack them into the vacuum chambers BY ANY MEANS.
References
|
||
|
||
Subsystems
Stray Light Control (incl.: beam baffles, output Faraday, calc. of BRDF...)
Green Transmit Telescopes (Aux. locking system itself should be considered in MIF...)
- Other local sensors/monitors/actuators?
- Any other optics, outside breadboard,...
- Squeezing system??
- Maybe mainly VIS group's charge and not AOS's:
Meetings