Line 1: Line 1:
Information of the Type-A Seismic Attenuation System (SAS). Information of the Type-A Seismic Attenuation System (SAS).    
Line 4: Line 4:
== Status ==

 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/WorkingLog|Site work log]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|Schedule (Task list)]]

 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/ETMX|ETMX]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/ETMY|ETMY]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/ITMX|ITMX]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/ITMY|ITMY]]

------
Line 6: Line 17:
------
[[TypeAdesign|{{attachment:figTypeAsasNamed2.png||width=25%,align="right"}}]]
[[TypeAoverview|{{attachment:TypeAoverview.png||width=33%,align="right"}}]]
[[TypeAdesign|{{attachment:figTypeAsasNamed3.png||width=33%,align="right"}}]]
Line 16: Line 27:
=== Room-temperature parts === === Tower ===
Line 18: Line 29:
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5634|Pre-Isolator]]  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=6918|Pre-Isolator]]
Line 32: Line 43:
=== Cryogenics === === Cryogenic Payload ===
Line 52: Line 63:
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9838|Installation direction of Bottom Filter]]
 * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10522|TF Yaw drive mechanism Initial adjustment]]
Line 61: Line 74:
   * Heavy set: 3-2(F1), 2-2(F2), 1-4(F3) 
   * Light set: 3-3(F1), 2-1(F2), 1-3(F3)
   * X end: 3-2(F1), 2-2(F2), 1-4(F3)
   * Y end: 3-3(F1), 2-1(F2), 1-3(F3)
Line 69: Line 82:
Line 70: Line 84:
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/DGSrack|DGS rack layout]]
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/DGSchannel|ADC/DAC channel assignment]]
Line 72: Line 88:
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1737|ADC board]]
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1736|DAC board]]
  * Quick information
   * ADC accepts +/- 10 V differential =
Line 78: Line 98:
 * Geophone
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=1466|Preamp circuit]]
Line 88: Line 110:
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=7587|In-Vacuum cables (hand made)]]
  * Type-A suspension cabling O4 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13378|<EX>]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13375|<EY>]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13404|<IX>]], [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=13406|<IY>]]
  * [[https://www.dropbox.com/sh/hkpunq1fjp7nduc/AAAzCL7GbeWAjGiGW8j3zDX2a?dl=0|Photos at installation (link to KAGRA dropbox)]]
  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/VIS/TypeA/Feedthough|Cable assignment at feedthough and filter side]]
  * [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9839|Result of continuity check and resistance measurement at installation]]
  * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11625|Pin assignment at feedthrough]]
Line 89: Line 117:
-----

 
-----
Line 92: Line 122:
 . Naohisa SATO
 . Lucia TROZZO
 . Yoshinori FUJII
 . Koki OKUTOMI
Line 93: Line 127:
 . Naohisa SATO
 . Koki OKUTOMI

== Schedule ==
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4792|Task list]]
Line 105: Line 134:
 * [[https://www.dropbox.com/home|KAGRA Dropbox]] > [[https://www.dropbox.com/home/Subsystems|Subsystems]] > [[https://www.dropbox.com/home/Subsystems/VIS|VIS]] > [[https://www.dropbox.com/home/Subsystems/VIS/TypeA|TypeA]]
Line 106: Line 136:

<<Navigation(children)>>

Information of the Type-A Seismic Attenuation System (SAS). This page wants information about not only room-temperature parts but also cryogenic vibration isolation system.

Status


TypeAoverview TypeAdesign

Drawings

  • Type-A SAS whole assy
  • Vacuum chamber

Tower

Cryogenic Payload

  • Cryo-Payload assy
  • Platform (PF)
  • Marionette (MT)
  • Marionette Recoil Mass
  • Intermediate Mass (IM)
  • Intermediate Recoil Mass
  • Test Mass (TM) - Sapphire Mirror
  • Recoil Mass
  • Heat link
    • Heat link suspension


Documents

Reports

Installation Procedure

Measurement and Analysis


Electronics


Members of Type-A Team

  • Ryutaro TAKAHASHI (Leader)
  • Naohisa SATO
  • Lucia TROZZO
  • Yoshinori FUJII
  • Koki OKUTOMI
  • Hideharu ISHIZAKI

Meeting