Differences between revisions 146 and 367 (spanning 221 versions)
Revision 146 as of 2012-09-06 16:06:26
Size: 7073
Comment:
Revision 367 as of 2020-09-07 07:44:15
Size: 6245
Editor: KousekiMiyo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
<<TableOfContents(3)>>
Line 4: Line 3:
== Vibration Isolation ==
 . Chief: R. Takahashi(ICRR)
 . Member: T. Uchiyama(ICRR), R. DeSalvo(Univ. of Sannio), H. Ishizaki(NAOJ), A. Takamori(ERI), E. Majorana(INFN), T. Sekiguchi(ICRR), K. Yamamoto(ICRR)
= Vibration Isolation System (VIS) =
Line 8: Line 5:
----
== Weekly EVO Meeting ==
 . Every Wednesday, 21:00(JST)
||<#a31f52 style="color:#ffffff; text-align:center;"> '''Meetings'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''Management'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''Other subsystem interfaces''' ||<#a31f52 style="color:#ffffff; text-align:center;"> '''For Users'''||<#a31f52 style="color:#ffffff; text-align:center;"> '''Apps''' ||
||[[KAGRA/Subgroups/VIS/MeetingNAOJ|Weekly VIS meeting]] || [[KAGRA/Subgroups/VIS/Schedule|Schedule]]|| [[KAGRA/Subgroups/VIS/AELInterfaces|AEL interfaces]] ||[[KAGRA/Subgroups/VIS/BugReports|Bug Reports]] ||[[KAGRA/Subgroups/VIS/OpsManual/SUMCON|SUMCON]]||
||[[KAGRA/Subgroups/VIS/ExtraMeetings|Extraordinary meetings]] || [[https://github.com/orgs/gw-vis/projects|Github Projects]]|| [[KAGRA/Subgroups/VIS/DGSInterfaces|DGS interfaces]] || [[KAGRA/Subgroups/VIS/TroubleShooting|Trouble Shooting]] || [[KAGRA/Subgroups/VIS/ModelPlotter|ModelPlotter]] ||
||[[KAGRA/Subgroups/VIS/OldVISMeetings|Old VISMeeting]] || || || || [[KAGRA/Subgroups/VIS/OpsManual/AutoMeasurement|AutoMeasurement]] ||
|| --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/SuspensionControlModeling|SuspensionControlModeling]] ||
Line 12: Line 11:
=== The ??th (5 September, 2012) ===
 . [[attachment:KAGRAvimeeting120905|Minute]]
||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Suspensions''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Mechanics''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Sensors''' ||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Actuators/Motors'''||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Digital System'''||<#1e50a2 style="color:#ffffff; text-align:center;"> '''Control'''||
||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeA|Type-A]] || [[KAGRA/Subgroups/VIS/Mechanics/Pre-Isolator|Pre-Isolator]] || [[KAGRA/Subgroups/VIS/Sensors/InertialSensor|Inertial Sensor]] || [[KAGRA/Subgroups/VIS/Actuators/VoiceCoilActuator|Voice coil actuator]] || [[KAGRA/Subgroups/VIS/RealTimeModel|RTModel]] || [[KAGRA/Subgroups/VIS/Control/General|General concept]] ||
||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeB|Type-B]] || [[KAGRA/Subgroups/VIS/Mechanics/GAS|GAS]] || [[KAGRA/Subgroups/VIS/Sensors/LVDT|LVDT]] || Solenoid actuator? || [[KAGRA/Subgroups/VIS/Guardian|Guardian]] || [[KAGRA/Subgroups/VIS/Kontrol|Kontrol]] ||
||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TypeBp|Type-Bp]] || [[KAGRA/Subgroups/VIS/Mechanics/MagneticDamper|Magnetic damper]] ||[[KAGRA/Subgroups/VIS/Sensors/PhotoSensor|Photo Sensor]] || [[KAGRA/Subgroups/VIS/Motors/Picomotor|Picomotor]] || [[KAGRA/Subgroups/VIS/OpsManual/SDF|SDF]] || - ||
||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/Type-C|Type-C]] || [[KAGRA/Subgroups/VIS/Mechanics/MaragingWire|Maraging wire]] || [[KAGRA/Subgroups/VIS/Sensors/OpLev|Optical Lever (OpLev)]] || [[KAGRA/Subgroups/VIS/Motors/StepperMotor|Stepper motor]] || - || - ||
||<style="font-weight:bold;"> [[KAGRA/Subgroups/VIS/TMS-VIS|TMS-VIS]] || --- ||<-2 style="text-align:center;"> [[KAGRA/Subgroups/VIS/Sensors/OSEM|OSEM]] || - || - ||
Line 15: Line 18:
=== The 24th (28 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/modal_0928.pdf|Modal Analysis of Tripod by Takanori]]
||<#52a31f style="color:#ffffff; text-align:center;"> '''Design''' ||<#52a31f style="color:#ffffff; text-align:center;"> '''Detail Design''' ||<#52a31f style="color:#ffffff; text-align:center;"> '''Installation''' ||<#52a31f style="color:#ffffff; text-align:center;"> '''Commissioning''' ||<#52a31f style="color:#ffffff; text-align:center;"> '''Operation''' ||<#52a31f style="color:#ffffff; text-align:center;"> '''Future Upgrade''' ||
|| Suspension Design || [[KAGRA/Subgroups/VIS/CAD|CAD]] || [[KAGRA/Subgroups/VIS/IstManual|Procedure]] || [[KAGRA/Subgroups/VIS/VISMON|VIS Monitors]] || [[KAGRA/Subgroups/VIS/OpsManual|Manual]]||[[KAGRA/Subgroups/VIS/Upgrade|Upgrade]] ||
|| [[KAGRA/Subgroups/VIS/ActuatorDesign|Actuator Design]] || [[KAGRA/Subgroups/VIS/RackLayout|Rack Layout]] || [[KAGRA/Subgroups/VIS/VISInstWorkInfo|Misc.]] || [[KAGRA/Subgroups/VIS/OpsManual/HealthCheck|HealthCheck]] ||├ [[KAGRA/Subgroups/VIS/OpsManual/Pico|Picomotor]] || --- ||
|| --- || [[KAGRA/Subgroups/VIS/Cabling|Cabling]] || [[KAGRA/Subgroups/VIS/Calibration|Calibration]] || --- || ├ [[KAGRA/Subgroups/VIS/OpsManual/FishingRods|Fishing Rods]] || --- ||
|| --- || --- || [[KAGRA/Subgroups/VIS/Acceptance Test|Acceptance Test]] || --- || ├ [[KAGRA/Subgroups/DGS/Projects/StepperMotor|Stepper Motor]] || --- ||
|| --- || --- || [[KAGRA/Subgroups/VIS/Diagonalization|Diagonalization]] || --- || └ || --- ||
|| --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/TypeA|TypeA|]] || --- ||
|| --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/TypeB|TypeB|]] || --- ||
|| --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/TypeBp|TypeBp|]] || --- ||
|| --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/TypeC|TypeC|]] || --- ||
|| --- || --- || --- || --- || [[KAGRA/Subgroups/VIS/OpsManual/TMS-VIS|TMS-VIS|]] || --- ||
Line 18: Line 30:
=== The 23th (15 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0915.pdf|Simulation on TypeB by Takanori]]
||<#808080 style="color:#ffffff; text-align:center;"> '''Links, Misic.''' ||<#808080 style="color:#ffffff; text-align:center;"> '''Documents''' ||
||Wiki [[https://awiki.ligo-wa.caltech.edu/wiki/Seismic_Isolation| SEI]], [[https://awiki.ligo-wa.caltech.edu/wiki/Suspensions|SUS]] || [[KAGRA/Subgroups/VIS/Introduction|VIS Introduction]] ||
||Log [[https://alog.ligo-la.caltech.edu/SEI/index.php?content=1| SEI]], [[https://alog.ligo-wa.caltech.edu/aLOG/index.php?content=1|LHO]], [[https://alog.ligo-la.caltech.edu/aLOG/|LLO]], [[https://logbook.virgo-gw.eu/virgo/|Virgo]] || [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=4005|VIS Doc. Tree]] ||
|| [[KAGRA/Subgroups/VIS/Photos|Photos]] || ||
Line 21: Line 35:
=== The 22th (7 September, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_rycy.pdf|Z-Assembly for RM by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/Type-B_system_bs.pdf|Z-Assembly for BS by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/TypeB_sim_0907.pdf|Simulation on TypeB by Takanori]]
== Requirements ==
VIS subgroup guarantee the following items;
 1. '''Isolation performance''': Does not contaminate the design sensitivity
 2. '''Stability''': Keep the above performance in anytime
 3. '''Operability''': Recover the all VIS system automatically
Line 26: Line 41:
=== The 21th (31 August, 2011) ===
=== The 20th (24 August, 2011) ===
=== The 19th (10 August, 2011) ===
=== The 18th (27 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/PayloadB_0727.pdf|Design of Type-B payload by Riccardo]]
Detail descriptions are written in here: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11930|JGW-E2011930]]
Line 32: Line 43:
=== The 17th (20 July, 2011) ===
=== The 16th (13 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/SR2-PR2_0711.pdf|SR2-PR2 recoil mass by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/angle_0713.pdf|Angular fluctuation of TM by Takanori]]
Line 37: Line 44:
=== The 15th (6 July, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/2type_0701.pdf|Type-B payload model by Sekiguchi]]

=== The 14th (29 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/kapton_0627.pdf|Kapton Wire by Sekiguchi]]

=== The 13th (22 June, 2011) ===
 . [[http://tamago.mtk.nao.ac.jp/ishizaki/LCGT/kaptonwire/cable.pdf|Kapton Wire by Ishizaki]]

=== The 12th (15 June, 2011) ===
=== The 11th (8 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/minute0608.pdf|Minute]]

=== The 10th (1 June, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/damping0601.pdf|Mode damping study by Takanori]]

=== The 9th (25 May, 2011) ===
=== The 8th (18 May, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/magicwand.png|Magic wands by Takanori]]
 . [[attachment:KAGRA/Subgroups/VIS/Check110512.pdf|Heavier test mass by Ettore and Takanori]]

=== The 7th (11 May, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/rep110511.pdf|Report by Takanori]]

=== The 6th (27 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/dimension110427.docx|Payload dimensions by Riccardo]]

=== The 5th (20 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/3D_model.pdf|Parameter Configuration by Ettore]]

=== (11 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/LCGT_PAY_10-30.pdf|Parameter Configuration by Ettore]]

=== The 4th (6 April, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/10-30_April06.docx|Simulation by Ettore]]
 . [[attachment:KAGRA/Subgroups/VIS/sequence110406.pdf|Installation sequence by Riccardo]]

=== The 3rd (30 March, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/coordinate110330.pdf|Coordinate system by Ryutaro]]
 . [[attachment:KAGRA/Subgroups/VIS/110330_isasA.pdf|Simulation by Takanori]]

=== The 2nd (23 March, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/memo110323.txt|Comments by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/report110323.doc|Status report by Riccardo]]
 . [[attachment:KAGRA/Subgroups/VIS/sim110323.pptx|Simulation by Ettore]]

=== The 1st (16 March, 2011) ===
 . [[attachment:KAGRA/Subgroups/VIS/Tower-a.pdf|Design for Type-A system]]
 . [[attachment:KAGRA/Subgroups/VIS/filter-chain.pdf|Detail of filter's chain]]

----
== LCGT防振系作業部会(2009) ==
=== 第6回 ===
 . 11月12日(木) 15:00-16:30 天文台輪講室
 . [[attachment:KAGRA/Subgroups/VIS/Modeling6.ppt|Model vs. Measurement in TAMA-SAS]]
 . [[attachment:KAGRA/Subgroups/VIS/chamber-AB.pdf|Design of Type-A,B chamber (rev.)]]

=== 第5回 ===
 . 10月15日(木) 13:00-14:30 天文台大会議室 ([[attachment:KAGRA/Subgroups/VIS/minutes5.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling5.ppt|LCGT-SAS Modeling 5 (Type-B,C)]]
 . [[attachment:KAGRA/Subgroups/VIS/chamber-A.pdf|Design of Type-A chamber]]

=== ブレーンストーミング ===
 . 10月1日(木) 13:00-15:00 東京大学理学部1号館445号室 ([[attachment:KAGRA/Subgroups/VIS/minutes-b.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/brest.pdf|メモ]]

=== 第4回 ===
 . 9月3日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes4.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling3.ppt|LCGT-SAS Modeling 3 (Gain boost)]]
 . [[attachment:KAGRA/Subgroups/VIS/Modeling4.pdf|LCGT-SAS Modeling 4 (Vertical, Pitch)]]
 . [[attachment:KAGRA/Subgroups/VIS/ICDsas2.doc|ICD update]] ([[attachment:ICDsas2.pdf|PDF]])

=== 第3回 ===
 . 8月6日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes3.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling2.ppt|LCGT-SAS Modeling 2]]
 . [[attachment:KAGRA/Subgroups/VIS/RandD2.pdf|低温懸架のR&Dについて]]

=== 第2回 ===
 . 7月16日(木) 15:00-16:30 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes2.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/Modeling1.ppt|LCGT-SAS Modeling]]
 . [[attachment:KAGRA/Subgroups/VIS/RandD.pdf|LCGT-SASのR&Dについて]]

=== 第1回 ===
 . 6月3日(水) 17:00-19:00 天文台輪講室 ([[attachment:KAGRA/Subgroups/VIS/minutes1.pdf|議事録]])
 . [[attachment:KAGRA/Subgroups/VIS/agenda1.pdf|作業班、スケジュール]]
 . [[attachment:KAGRA/Subgroups/VIS/ICDsas.doc|ICD]] ([[attachment:ICDsas.pdf|PDF]])
 . [[attachment:KAGRA/Subgroups/VIS/LCGT-SAS2.pdf|常温-低温接続部]]
 . R&Dについて (次回)

----
== Archive ==
=== TAMA SAS ===
 . [[attachment:KAGRA/Subgroups/VIS/Report2009.ppt|Evaluation of TAMA-SAS for LCGT]]
 . [[attachment:tama_sas.pdf|Drawings of TAMA SAS]]
 . [[KAGRA/Subgroups/VIS/FEM/tama_sas|Item list to be improved]]

=== TAMA Double Pendulum ===
 . [[LCGT/subgroup/vis/tama_double|Item list to be improved]]

=== Seismic spectrum in Kamioka mine ===
 . [[attachment:LCGT/subgroup/ifo/SPI/HeatLink/0702seis_Araya.zip|In loud day]] (This data should be used as nominal ground motion in Kamioka)
 . [[attachment:CLIO/NoiseBudgets/seismic/cryo_seismic.txt|In cryostat]]

=== LCGT-SAS model ===
 . Transfer function X0~X7/Xg --([[attachment:KAGRA/Subgroups/VIS/model_trf.txt|(old)]])--
 . Modeling M-file --([[attachment:KAGRA/Subgroups/VIS/model_mfile.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_mfile2.zip|(2009/8/17)]]
 . Spectrum of displacement --([[attachment:KAGRA/Subgroups/VIS/model_disp.zip|(2009/8/15)]])--[[attachment:KAGRA/Subgroups/VIS/model_disp2.zip|(2009/8/17)]]

=== Finite Element Analysis ===
 . [[KAGRA/Subgroups/VIS/FEM|FEM Page]]

=== Rigid-Body Models ===
 . [[KAGRA/Subgroups/VIS/Simulation|Simulation Page]]
-----
/!\ [April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted [[https://github.com/gw-vis/kagra-vis/issues/18|here]].

Vibration Isolation System (VIS)

Meetings

Management

Other subsystem interfaces

For Users

Apps

Weekly VIS meeting

Schedule

AEL interfaces

Bug Reports

SUMCON

Extraordinary meetings

Github Projects

DGS interfaces

Trouble Shooting

ModelPlotter

Old VISMeeting

AutoMeasurement

---

---

---

---

SuspensionControlModeling

Suspensions

Mechanics

Sensors

Actuators/Motors

Digital System

Control

Type-A

Pre-Isolator

Inertial Sensor

Voice coil actuator

RTModel

General concept

Type-B

GAS

LVDT

Solenoid actuator?

Guardian

Kontrol

Type-Bp

Magnetic damper

Photo Sensor

Picomotor

SDF

-

Type-C

Maraging wire

Optical Lever (OpLev)

Stepper motor

-

-

TMS-VIS

---

OSEM

-

-

Design

Detail Design

Installation

Commissioning

Operation

Future Upgrade

Suspension Design

CAD

Procedure

VIS Monitors

Manual

Upgrade

Actuator Design

Rack Layout

Misc.

HealthCheck

Picomotor

---

---

Cabling

Calibration

---

Fishing Rods

---

---

---

Acceptance Test

---

Stepper Motor

---

---

---

Diagonalization

---

---

---

---

---

---

TypeA

---

---

---

---

---

TypeB

---

---

---

---

---

TypeBp

---

---

---

---

---

TypeC

---

---

---

---

---

TMS-VIS

---

Links, Misic.

Documents

Wiki SEI, SUS

VIS Introduction

Log SEI, LHO, LLO, Virgo

VIS Doc. Tree 

Photos

Requirements

VIS subgroup guarantee the following items;

  1. Isolation performance: Does not contaminate the design sensitivity

  2. Stability: Keep the above performance in anytime

  3. Operability: Recover the all VIS system automatically

Detail descriptions are written in here: JGW-E2011930


/!\ [April 28. 2020] Miyo is cleaning up the VIS wiki pages. Progress is posted here.

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)