Differences between revisions 29 and 41 (spanning 12 versions)
Revision 29 as of 2018-07-06 18:48:10
Size: 2694
Comment:
Revision 41 as of 2018-07-18 16:44:12
Size: 3781
Comment:
Deletions are marked like this. Additions are marked like this.
Line 4: Line 4:
||<<MonthCalendar(,2018,5)>>||<<MonthCalendar(,2018,6)>>|| ||<<MonthCalendar(,2018,5)>>||<<MonthCalendar(,2018,6)>>||<<MonthCalendar(,2018,7)>>||
Line 8: Line 8:
 * https://gwpo.nao.ac.jp/wiki/ATCstandalone  * [[https://gwpo.nao.ac.jp/wiki/ATCstandalone|Standalone Machine in ATC]]
 * '''TMS VIS coordinate''': [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ProcessDocumentAdd (by Uraguchi-san)]]
Line 11: Line 12:
 * Memo: [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8480]]
Line 35: Line 37:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8466|Data sheets of the geophones (JGW-T1808466)]]
Line 36: Line 39:
|| Serical# of L-4C||Vert/Horiz||Naming of the assembled unit||Assembler||
|| 404080975 || Vert || || ||
|| 404080976 || Vert || TMS-VISX: Geo-V2|| Akutsu ||
|| 404080977 || Vert || || ||
|| 404080978 || Vert || || ||
|| 404084240 || Vert || || ||
|| 404084241 || Vert || TMS-VISX: Geo-V3|| Akutsu ||
|| 404084242 || Vert || TMS-VISX: Geo-V1|| Fujii -> Akutsu ||
|| 2 || Horiz|| TMS-VISX: Geo-H3|| Akutsu -> Uraguchi ||
|| 3 || Horiz|| || ||
|| 4 || Horiz|| TMS-VISX: Geo-H1|| Akutsu ||
|| 5 || Horiz|| TMS-VISX: Geo-H2|| Akutsu ||
|| 15 || Horiz|| || ||
|| 16 || Horiz|| || ||
|| 17 || Horiz|| || ||

 

 

Transmission Monitor's Vibration Isolation Stage: preparation (TMS-VIS)

  • With a fixed stage.
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2018 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

<< <  2018 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

LVDTs

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below for #1 and #2, as I needed to once detach the pins when I installed the LVDTs (Akutsu).

Actuator coils

Be careful! The pin assignment in the Dsub shell or the signal phases would be different from the below, as I needed to once detach the pins when I installed the coils (Akutsu).

Geophones

Serical# of L-4C

Vert/Horiz

Naming of the assembled unit

Assembler

404080975

Vert

404080976

Vert

TMS-VISX: Geo-V2

Akutsu

404080977

Vert

404080978

Vert

404084240

Vert

404084241

Vert

TMS-VISX: Geo-V3

Akutsu

404084242

Vert

TMS-VISX: Geo-V1

Fujii -> Akutsu

2

Horiz

TMS-VISX: Geo-H3

Akutsu -> Uraguchi

3

Horiz

4

Horiz

TMS-VISX: Geo-H1

Akutsu

5

Horiz

TMS-VISX: Geo-H2

Akutsu

15

Horiz

16

Horiz

17

Horiz

Cabling

  • LVDT/Act - (coil wires) - Dsub9M - (Dsub9F - PTFE 2m - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • Geophone - (MIL C 26482 - PTFE 0.5m - Dsub9M) - (Dsub9F - 1.5m PTFE - Dsub9F) - Dsub9M flange - Flipper cable - Dsub Cable
  • PTFE cables

Task list

Note: some of the tasks can be done in parallel.

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/subgroup/AOS/TMS-VIS0 (last edited 2018-10-24 19:00:52 by TomotadaAkutsu)