Differences between revisions 6 and 7
Revision 6 as of 2018-06-25 14:29:22
Size: 1662
Editor: SimonZeidler
Comment:
Revision 7 as of 2018-06-26 17:32:52
Size: 1667
Editor: SimonZeidler
Comment:
Deletions are marked like this. Additions are marked like this.
Line 21: Line 21:
 * Place/install the WAB suspension.  * --(Place/install the WAB suspension)--

Wide Angle Baffle at IXC

<< <  2018 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  

<< <  2018 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the WAB suspension

  • Align the position of WAB -> take WAB back to nominal position, put off protectors

  • Blow inside the WAB; put protectors and shield the aperture (foil?)
  • Clean area around chamber
  • Heat-Link adapter to WAB -> Needs to be designed (Akutsu/Obuchi)

  • Thermometer adapter to WAB

KAGRA/subgroup/AOS/WideAngleBaffleIX (last edited 2021-11-24 20:51:41 by TomotadaAkutsu)