Size: 5583
Comment:
|
Size: 5597
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* [[KAGRA/Meeting/Reviews/PAB|Program Advisory Board]] will be held at Toyama University. | * [[KAGRA/Meeting/Reviews/PAB|Program Advisory Board]] will be held on 10/31~11/1 at Toyama University. |
KAGRA Wiki
News
Program Advisory Board will be held on 10/31~11/1 at Toyama University.
Site shift started: wiki page
Meetings |
KAGRA collaboration meeting |
Documents |
|
Special WG' |
KAGRA Roadmap |
Tools |
KAGRA conference calendar |
Task management |
Safety Control |
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
** |
Detector Characterization |
DC |
Project time-line
Time-line chart is here (password protected).
iKAGRA wiki: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
bKAGRA wiki: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Target Sensitivity of bKAGRA
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)