5503
Comment:
|
5638
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Meeting/Collaboration|International KAGRA meeting]] (12/9, 9am-11am) | |
Line 69: | Line 68: |
.[[http://www.supersaas.jp/schedule/kamioka-house/KAIGI|TV meeting room at Hokubu-kaikan reservation page]] .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3544|Manual: How to take garbage away in KAGRA site (in Japanese).]] |
KAGRA Wiki
News
Site shift started: wiki page
Meetings |
KAGRA collaboration meeting |
Documents |
|
Special WG' |
KAGRA Roadmap |
Tools |
KAGRA conference calendar |
Task management |
Safety Control |
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
||
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
** |
Detector Characterization |
DC |
Project time-line
Time-line chart is here (password protected).
iKAGRA wiki: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
bKAGRA wiki: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Target Sensitivity of bKAGRA
KAGRA Official Documents