Size: 5101
Comment:
|
Size: 4969
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
* [[https://kgwg.nims.re.kr/kagra5th/kagra5th/Program.html|5th Korea-Japan workshop (Nov 29th and 30th)]] * [[https://events.ego-gw.it/indico/conferenceDisplay.py?ovw=True&confId=7|2nd ELiTES meeting (Dec 4th and 5th)]] |
* [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Meeting/F2F|f2f meeting]] (Feb. 13-15) |
KAGRA Wiki
News
f2f meeting (Feb. 13-15)
Meetings |
KAGRA collaboration meeting |
Documents |
|
Special WG' |
KAGRA Roadmap |
Tools |
KAGRA conference calendar |
Subsystems
Subgroup name |
Links |
|||
1 |
Tunnel |
TUN |
||
2 |
Facility |
FCL |
|
|
3 |
Vacuum |
VAC |
|
|
4 |
Cryogenics |
CRY |
||
5 |
Vibration Isolation |
VIS |
||
6 |
Mirror |
MIR |
|
|
7 |
Laser |
LAS |
|
|
8 |
Main Interferometer |
MIF |
|
|
9 |
Input/Output Optics |
IOO |
|
|
10 |
Auxiliary Optics Subsystem |
AOS |
||
11 |
Analog Electronics |
AEL |
||
12 |
Digital System |
DGS |
||
13 |
Data Management |
DMG |
|
|
14 |
Data Analysis |
DAS |
|
|
15 |
Geophysics Interferometer |
GIF |
|
|
** |
Detector Characterization |
DC |
Project time-line
Time-line chart is here (password protected).
iKAGRA wiki: iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
bKAGRA wiki: bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Target Sensitivity of bKAGRA
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)