Differences between revisions 41 and 43 (spanning 2 versions)
Revision 41 as of 2010-09-03 08:52:55
Size: 753
Comment:
Revision 43 as of 2010-09-03 08:54:53
Size: 686
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * [[LCGT/Meeting/f2f/2010s|Face to face meeting]]: Every 3 months.
  *Next f2f meeting: In the week of September 27
 * [[LCGT/Meeting/f2f/Top|Face to face meeting]]: Every 3 months.
  *Next f2f meeting: [[LCGT/Meeting/f2f/2010Sept|September 27-28, 2010]]
Line 10: Line 10:
 * [[LCGT/subgroup/analysis/Meeting/Analysis2010|解析ミーティング(2010年度)]]

Meeting & Conferences

Periodic Meetings

Working group meeting

JGWC

  • JGWC: 2010/8/6 16:00~18:00

Travel & Conferences (出張、講演・会議等)

Remote participation (遠隔参加)

LCGT/Meeting (last edited 2012-06-06 12:17:47 by OsamuMiyakawa)