Differences between revisions 256 and 257
Revision 256 as of 2020-03-11 15:04:02
Size: 4792
Editor: KokiOkutomi
Comment:
Revision 257 as of 2020-03-11 15:04:37
Size: 4796
Editor: KokiOkutomi
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
|| || || || [[KAGRA/Subgroups/VIS/Apps/ModelPlotter|ModelPlotter]] || || || || || || [[KAGRA/Subgroups/VIS/Apps/ModelPlotter|ModelPlotter]] ||

VIS

Vibration Isolation System is the hardware infrastructure for the main optics in the KAGRA interferometer. The VIS subgroup works for ...

Meetings

Management

For users

For developpers

Weekly VIS Meeting

Schedule

Extraordinary Meetings

Tall suspensions

Type-A

Type-B

Type-Bp

ETMX

ETMY

ITMX

ITMY

BS

SRM

SR2

SR3

PRM

PR2

PR3

Short suspensions

Type-C

TMS-VIS

MCE

MCI

MCO

IMMT1

IMMT2

OMMT1

OMMT2

OSTM

TMSX

TMSY

Mechanics

Sensors

Actuators/Motors

Other subsystem interfaces

Apps

Pre-Isolator

LVDT

Voice Coil Actuator

AEL interfaces

SUMCON

ModelPlotter


VIS Upgrades

Upgrade Page


Instruments

Suspension types

Type-A

Type-B

Type-Bp

Type-C

Payload

Actuator design summary

Design Change Logs

Real-time front-end model


Apps


Installation


Real Time Model Development


Operation


VIS Introductioon


VIS Commissioning


Archives


Old Weekly EVO Meeting

  • This meeting is suspended.

Past minutes

Subgroup

Members

  • Chief: R. Takahashi
  • Member: N. Ohishi, H. Ishizaki, F. E. Pena Arellano, M. Barton, N. Hirata, R. Flaminio, Y. Aso, T. Akutsu , E. Tapia (NAOJ),

    T. Sekiguchi, K. Yamamoto, T. Uchiyama (ICRR), R. DeSalvo (Univ. of Sannio), E. Majorana (INFN Rome), J. van den Brand, E. Hennes, A. Bertolini, J. van Heijningen, K. Agatsuma (NIKHEF)

Communication info

  • Mailing list: [kagra-seis]

KAGRA/Subgroups/VIS (last edited 2022-02-25 19:10:23 by HirotakaYuzurihara)