Differences between revisions 573 and 574
Revision 573 as of 2020-11-11 11:19:42
Size: 16299
Comment:
Revision 574 as of 2020-11-11 11:35:10
Size: 16311
Comment:
Deletions are marked like this. Additions are marked like this.
Line 17: Line 17:
   * The deadline is November 30 (Mon).    * The deadline is '''November 30 noon'''(Mon).
Line 27: Line 27:
 * Registration is on-going. For abstract submission, the deadline is ''November 20th'' (Fri).  * Registration is on-going. For abstract submission, the deadline is '''November 20th''' (Fri).

KAGRA Wiki

Information for researchers. For general information, please go to https://gwcenter.icrr.u-tokyo.ac.jp.



The 26th Face-to-Face meeting (in remote style) December 17 (Thur) - 18 (Fri, morning)

  • Registration page

    • The deadline is November 30 noon(Mon).

    • We ask you to make registration (even if you are not planning to make presentation) for sending out the access info.
  • Information page New wiki (in editing, requires KAGRA account)

  • Any confidential contents (e.g. observational results, internal strategies) should be discussed only in F2F, not in KIW7.
  • Pre-telecon is scheduled December 1st (Tue) 18:00 JST on Zoom. See KAGRA/KSC/Meeting#20201201. Details will be informed later in kagra mailing list.

The 7th KAGRA International Workshop (KIW7) December 18 (Fri, afternoon) - 20 (Sun)

  • Hybrid style. In person for Taiwan people, in remote for others.
  • Website is open.

  • Registration is on-going. For abstract submission, the deadline is November 20th (Fri).

  • KIW7 will organize plenary sessions of "O3GK reports" (commissioning, calibration, PEM, detchar, etc), and "Toward O4" (instruments, designs, analysis, etc). Please contribute them at KIW7, if the contents are not confidential.

News

  • LIGO Data Grid access is available. See [kagra 03375] and here.

  • Application to access account for LVC resources (gw-astronomy account). See [kagra 03713] and apply from here.

  • FAQ (Frequently Asked Question page) is open. The sample of Acknowledgment.

  • Coming meetings
    • KSC telecon: December 1 (Tue), 2020 @ Zoom KAGRA/KSC/Meeting#20201201

    • The 26th KAGRA Face-to-Face meeting: Online Style : December 17-18, 2020.

    • The 7th KAGRA International Workshop (KIW7) at National Central University in Taiwan will be held in December 18-20, 2020.


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
KAGRA International Workshop
Chief Meeting blog (Old Chief Meeting)
Reviews
ET-KAGRA collaboration (ELiTES)
Related events

Documents
/Information

Summary of various KAGRA accounts
Mailing lists
KAGRA log (klog)
JGWDoc
KAGRA DAC wiki
KAGRA Design Document Tree
Blogs
SVN
Bugzilla -- issue tracker (internal only)
MOU
Terminology
Publications
Collaboration Member list
Operation Manuals
KAGRA reports
KAGRA Daily Morning Meeting

Task management

Site Shift schedule
KAGRA organization chart
Project Chart page
Reservation for theKoachFilters

Tools

How to upload documents to JGWDoc (Japanese, English)
How to use SVN
How to use this JGW wiki (Japanese, English)
How to start using klog
How to use Remote participation tools

Commissioning

Commissioning top

Engineering Run

ER191217-24
ER200220-25
ER200401-0407

KAGRA-JRPC

20-01-24
20-02-20

Observation

Observation top
iKAGRA observation (2016:3/15-31, 4/11-25)
bKAGRA phase1 (2018:4/28-5/6)
KAGRA 1st observation(2020/2/25-3/10, 4/7-4/21)

Upgrades

Post O3 upgrades

Safety and Activity Control

Safety top

Warning System (in UTnet)

Workers Monitoring (in UTnet)

Collaborators Entrance Application


[2] KSC contents

KSC = KAGRA Scientific Congress

KSC

KSC page (KSCboard, Committees, KSC members)

KSC newsletter

No.7 (2020 April), No.6 (2019 December), No.5 (2019 August), No.4 (2019 April), No.3 (2018 December), No.2 (2018 August), No.1 (2018 April)

Rules and Regulations

links in KSC page

KAGRA Data Analysis Working Group

Data Analysis Working Group

Data Analysis Working Group Top Page

Data Analysis Committee

Data Analysis Committee Top Page

Working Groups

CBC
Burst
Continuous Waves
Stochastic background
Computing and Software


KAGRA Documents


[3] Site Access information

How to work at the KAGRA site?

Technical information

  • Table of KAGRA location (Table)


[4] Subsystems

Subgroups

Subgroup name

Links

0

System Integration

---

wiki

1

Tunnel

TUN

wiki

blog

2

Facility

FCL

wiki

blog

3

Vacuum

VAC

wiki

4

Cryogenics

CRY

wiki

blog

5

Vibration Isolation

VIS

wiki

blog

6

Mirror

MIR

wiki

7

Laser

LAS

wiki

8

Main Interferometer

MIF

wiki

9

Input/Output Optics

IOO

wiki

blog

10

Auxiliary Optics Subsystem

AOS

wiki

blog

11

Analog Electronics

AEL

wiki

blog

12

Digital System

DGS

wiki

blog

13

Data Management

DMG

wiki

14

Data Analysis

DAS

wiki

15

Geophysics Interferometer

GIF

wiki

16

Detector Characterization

DET

wiki

blog

17

Calibration

CAL

wiki

18

Physical Environment Monitors

PEM

wiki

**

Advanced R&D

wiki

**

NAOJ Test alog

(NAOJ)

NAOJlog

**

KAGRA Stock in Shelfs

Info Page

* Some of the activities in the mine by NAOJ group are reported on NAOJ test alog.

KAGRA Document and Drawing Tree


[5] Other information

Target Sensitivity of bKAGRA

latest estimated sensitivity curve

  • Sensitivity data can be downloaded from JGW-T1707038

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.

Others

KAGRA (last edited 2024-03-19 14:08:05 by MihokoOkinaka)