2680
Comment:
|
2507
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= LCGT Auxiliary Optics Subsystem (AOS) = | ## page was renamed from LCGT/subgroup/AOS = LCGT Auxiliary Optics System (AOS) = |
Line 6: | Line 7: |
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together. | . The objectives of the subgroup ''' "Auxiliary Optics System" (AOS) ''' is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together. |
Line 9: | Line 10: |
Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required. |
. Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. . Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required. |
Line 15: | Line 16: |
||[[LCGT/SVN|LCGT SVN]] ||[[LCGT/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]|| | ||[[LCGT/SVN|LCGT SVN]] ||[[KAGRA/Terminology|Terminology]]||[[LCGT/iLCGT/Subgroup/DiscussionRana2010 | Discussion with Rana 2010]]|| ||[[LCGT/Meeting/RoadMap | Roadmap]] || || |
Line 19: | Line 21: |
* <!> Including beam baffles, output Faraday isolators, and calculation of BRDF of test masses... * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Pick-off and transmit telescopes]] |
* [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]] |
Line 22: | Line 23: |
* <!> Optical lever is a kind of local sensors, but unlike other local sensors, it requires long beam lines as lever's arms, thus this should be considerd in AOS. * [[LCGT/subgroup/AOS/CCD1|CCD monitors]] * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]] * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]] * [[LCGT/subgroup/AOS/BeamTarget1|Beam Targets in Arms]] * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Mode Profiler]] * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]] * Other local sensors/monitors/actuators? |
* [[LCGT/subgroup/AOS/CCD1|Imagers and Light Sources (CCD Monitors or equivalent)]] * [[LCGT/subgroup/AOS/Viewport1|Viewports]] * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]] * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Profilers for large beams]] |
Line 31: | Line 29: |
* Squeezing system?? * Maybe mainly VIS group's charge and not AOS's: * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]] * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]] |
* Squeezing system?? * Highly Related Subsystems (not included in AOS) * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO, MIF) * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF) * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS) * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?) |
LCGT Auxiliary Optics System (AOS)
Contents
Objectives
The objectives of the subgroup "Auxiliary Optics System" (AOS) is to design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the KAGRA interferometer together.
General Description
- Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established.
- Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating KAGRA, so we shall, by any means, pack them into the vacuum chambers if required.
References
|
||
|
||
|
Subsystems
- Any other optics, outside breadboard,...
- Squeezing system??
- Highly Related Subsystems (not included in AOS)
Meetings