Differences between revisions 105 and 115 (spanning 10 versions)
Revision 105 as of 2012-01-24 17:12:37
Size: 2677
Comment:
Revision 115 as of 2012-02-10 14:50:56
Size: 2674
Comment:
Deletions are marked like this. Additions are marked like this.
Line 20: Line 20:
 * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Pick-off and transmit telescopes]]  * [[LCGT/subgroup/AOS/BeamReduceTelescope1|Beam Reducing Telescopes]]
Line 23: Line 23:
 * [[LCGT/subgroup/AOS/CCD1|CCD monitors]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports on Vacuum Chambers]]
 * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Beam Targets in Arms]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Beam Mode Profiler]]
 * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]]
 * Other local sensors/monitors/actuators?
 * [[LCGT/subgroup/AOS/CCD1|Viewing Monitors and Light Sources]]
 * [[LCGT/subgroup/AOS/Viewport1|Viewports]]
 * [[LCGT/subgroup/AOS/BeamTarget1|Automatic Target System]]
 * [[LCGT/subgroup/AOS/BeamModeProfiler1|Mode Profiler for huge beam]]
Line 31: Line 29:
 * Squeezing system??
 * Maybe mainly VIS group's charge and not AOS's:
  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]]
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]]
  * Squeezing system??

 * Highly Related Subsystems (not included in AOS)
  * [[LCGT/subgroup/AOS/Shutter1|Beam Shutters]](IOO,
MIF)
  * [[LCGT/subgroup/AOS/InitialAlign1|Initial Alignment]](MIF)

  * [[LCGT/subgroup/AOS/JBOSEM1|Local Sensors and Actuators (LIGO's OSEM-like things utilized in vibration isolation system)]](VIS)
  * [[LCGT/subgroup/AOS/Violine1|Violine mode sensors or Wire position sensors (utilized in vibration isolation system or in noise-hunting phase)]](VIS?)

LCGT Auxiliary Optics System (AOS)


Objectives

The objectives of the subgroup "Auxiliary Optics System" (AOS) is to have the other LCGT subgroups design and complete the auxiliary optics that physically, logically and consistently glue the main parts of the LCGT interferometer together.

General Description

Most of the AOS shall be fit to the vacuum chambers that had been already determined when the AOS group was established. Even if the vacuum chamber was not designed considering the space allocated for AOS, AOS are required for fully operating LCGT, so we shall, by any means, pack them into the vacuum chambers if required.

References

Aux. opt. list from MIF's point of view

Layout Meeting

Optical Parameters

Parameter Meeting

LCGT SVN

Terminology

Discussion with Rana 2010

Subsystems

Meetings

KAGRA/Subgroups/AOS (last edited 2019-04-11 15:18:56 by TomotadaAkutsu)